CHEF DE FILE PLUS THE LEADER PLUS
Transcription
CHEF THE DE FILE LEADER PLUS PLUS ÉTATS-UNIS / UNITED STATES FRANCE CANADA ROYAUME-UNI / UNITED KINGDOM ALLEMAGNE / GERMANY sitq.com_hiver 2008_winter 2008 L’édifice Price / The Price Building LA MISE EN LUMIÈRE DE L’ÉDIFICE PRICE : ILLUMINATION OF THE PRICE BUILDING: REHAUSSER UN IMMEUBLE HISTORIQUE DE FAÇON ÉCO-ÉNERGÉTIQUE ENERGY-EFFICIENT ENHANCEMENT OF A HISTORIC MONUMENT Dans la foulée des fêtes du 400e anniversaire de la ville de Québec et en collaboration avec la Commission de la capitale nationale, SITQ procédera à la mise en lumière de l’édifice Price afin de rehausser le caractère historique et les qualités architecturales de cet immeuble de bureaux du Vieux-Québec. « Ce projet constituait un véritable défi puisqu’il devait répondre à la fois au plan directeur de la Ville de Québec pour la mise en lumière des bâtiments ainsi qu’aux préoccupations de SITQ en matière d’efficacité énergétique », souligne Armand Morin, gérant de projets au département de construction de SITQ. « Nous avons donc constitué une équipe de travail multidisciplinaire composée de représentants de la Société et de professionnels de l’externe, dont des architectes, des ingénieurs et des spécialistes de l’éclairage. Grâce à plusieurs sessions de travail acharné et soirées d’essais sur les lieux, nous avons réussi à élaborer un concept unique et novateur. » In light of Québec City’s 400th anniversary and in cooperation with Commission de la capitale nationale, SITQ will illuminate the Price Building, highlighting the historic significance and architectural features of this Old Québec office building. “This project represented a real challenge as it had to meet the requirements of both Québec City’s building illumination master plan and SITQ’s energy efficiency guidelines,” explained SITQ Construction Department project manager Armand Morin. “To tackle it, we put together a multidisciplinary team of SITQ staff and outside professionals, including architects, engineers, and lighting experts. Thanks to lots of hard work and onsite evening trials, we succeeded in developing a unique and innovative concept.” (Suite en page 3 / Continued on page 3) CHEF THE DE FILE LEADER PLUS PLUS Hiver 2008 Chef de file Plus est produit et publié par le Service du Marketing et recherche de marchés. SITQ Siège social 1001, rue du Square-Victoria Montréal (Québec) H2Z 2B1 Rédactrice en chef : Christiane Sauvé, Conseillère Marketing et recherche de marchés Rédaction : Sarah Marchand Conception, réalisation graphique et impression : LXB Communication Marketing Dépôt légal : Bibliothèque nationale du Québec Toute reproduction est permise à la condition de mentionner la source et de faire parvenir une copie à SITQ. SITQ 4, Place Ville Marie, bureau 600 Montréal (Québec) H3B 2E7 Téléphone : 514 861-9393 Télécopieur : 514 861-4560 Courriel : [email protected] Winter 2008 The Leader Plus is produced and published by the Marketing and Market Research Service. SITQ Head Office 1001 Square-Victoria Montréal QC H2Z 2B1 Editor in Chief: Christiane Sauvé, Marketing and Market Research Advisor Writing: Sarah Marchand Design, production, and printing: LXB Communication Marketing Legal deposit: Bibliothèque nationale du Québec Reproduction is permitted provided that the source is mentioned and that a copy is sent to SITQ. SITQ souhaite la bienvenue à ses nouveaux locataires et est heureuse de souligner le renouvellement du partenariat avec les entreprises locataires suivantes : / SITQ would like to welcome its new tenants and is pleased to announce the renewal of its partnership with the following tenant companies: NOUVELLE LOCATION / NEW LOCATION Centre de Commerce mondial de Montréal / World Trade Center Montréal Galerie Jacques Germain Groupe-Conseil Envirostratégies Inc. 1000, De La Gauchetière Ouest / 1000 De La Gauchetière West BDO Dunwoody LLP Consulat général de la République arabe d’Égypte / Consultate General of the Arab Republic of Egypt Fusion Montréal Crémerie Artisanale Inc. Gestion de Placements Hélène Dion Inc. Lundbeck Canada Inc. Pictet Canada L.P. Place Ville Marie Ecco Canada Inc. / Ecco Shoes Canada Inc. Thyme Maternité / Thyme Maternity Sushi-Man RENOUVELLEMENT / RENEWAL Centre de Commerce mondial de Montréal / World Trade Center Montréal Gestion Lejolex Inc. Kyoze Quartier International de Montréal Voyage Excellent 1981, McGill College / 1981 McGill College L’Association des Brasseurs du Québec Staubach de l’Est du Canada Inc. 2001, McGill College / 2001 McGill College Groom & Associés Limité / Groom & Associates Ltd. Place Ville Marie Caravelle Corporation Recherche Capital / Research Capital Corporation MMMuffin Lunetterie New Look Inc. / New Look Eyewear Inc. Rogers Sans-Fil / Rogers Wireless Service de garde de la Place Ville Marie TNG Capital Inc. Transcontinental Inc. Université Queen / Queen’s University Édifice Mérici / Mérici Building R3D Conseil Inc. / R3D Consulting Édifice Price / Price Building Caisse de dépôt et placement du Québec Une marque de confiance appréciée ! A sign of trust we value! Chef de file Plus est imprimé sur du papier Rolland Enviro100 qui contient 100 % de fibres recyclées postconsommation, sans chlore et accrédité par Choix environnemental et FSC Recyclé. Ce choix reflète bien l’engagement de SITQ à placer l’environnement au cœur de ses priorités. The Leader Plus is printed on Rolland Enviro100 paper, made from 100% postconsumer recycled fibres, chlorine-free, and accredited by Environmental Choice and FSC-Recycled. This choice reflects SITQ’s commitment to make the environment a top priority. 2 POSITION PLACER VERSION BILINGUE VERTE L’AMÉNAGEMENT LOCATIF:UN DOMAINE DANS LEQUEL LE SAVOIR-FAIRE ET L’EXPÉRIENCE SONT DES GAGES DE SUCCÈS L’aménagement de ses locaux est un élément clé quand vient le temps de s’installer dans un immeuble. En effet, plusieurs critères et spécifications doivent être pris en considération afin que l’utilisation de l’espace soit optimale et qu’il en résulte un lieu de travail aussi agréable que confortable. Or, l’équipe de la construction de SITQ jouit d’une vaste expertise à cet égard et offre des services hors-pair aux locataires qui désirent aménager leurs bureaux. « Nous sommes en mesure de proposer un véritable service clés en main », explique Christian Ducharme, directeur, Construction. « Nous connaissons toutes les composantes et particularités des immeubles que nous gérons, nous faisons affaire avec un bassin de fournisseurs compétents, habitués à travailler dans nos édifices et maîtrisant nos normes et standards, et nous pouvons garantir une démarche rigoureuse. » Ainsi, une entreprise voulant faire aménager ses bureaux n’a qu’à présenter son plan, ses enjeux et ses exigences à l’équipe, qui se charge ensuite de réaliser la planification, de gérer les appels d’offres, de superviser l’exécution des travaux conformément aux plans et devis et d’effectuer un suivi rigoureux de l’échéancier, des budgets et de la qualité du travail. De plus, l’équipe de construction s’assure d’obtenir et de transmettre au client toute la documentation requise – lettres de conformité à la CSST et à la CCQ, lettres de garantie, quittances finales, manuels d’entretien des équipements, etc. – ce qui permet de faciliter l’exploitation des locaux et de diminuer les risques d’affaires. Une attention particulière à l’environnement Lors de l’exécution d’un projet d’aménagement, de réaménagement ou de déconstruction d’un local, une attention toute particulière est accordée au respect de l’environnement. « Nous cherchons constamment à récupérer, réutiliser et recycler », mentionne Christian Ducharme. Lorsque c’est possible, plutôt que d’envoyer les déchets de construction au dépotoir, l’équipe demande à l’entrepreneur d’en faire le tri et d’acheminer le plus de choses possible dans des centres de récupération. De plus, les éléments pouvant être réutilisés sont récupérés, qu’il s’agisse de portes et de cadrages, de colombages métalliques, de câblage, d’interrupteurs ou autres. « Nous avons récemment recruté un ingénieur en mécanique du bâtiment détenant une accréditation professionnelle PA LEED du Conseil du bâtiment durable du Canada et quelques chargés de projets sont en voie d’obtenir cette certification. Nous sommes également à élaborer un devis environnemental qui s’appliquera à tous nos projets. La protection de l’environnement pour nous est donc un engagement ferme qui se concrétise au quotidien dans les diverses étapes de nos projets », conclut M. Ducharme. TENANT LEASEHOLD IMPROVEMENTS: A FIELD WHERE KNOW-HOW AND EXPERIENCE GUARANTEE SUCCESS Leasehold improvements are a key element when preparing to move into a rental property. In fact, numerous criteria and specifications must be taken into account to optimize space and create a work environment that is as enjoyable as it is comfortable. The SITQ construction and renovation team boasts extensive expertise in this area and offers outstanding service to tenants looking to prepare their premises. “We can provide real turnkey solutions,” explains manager of construction Christian Ducharme. “We know all the aspects and particularities of each and every property we manage. We do business with a pool of qualified suppliers who are accustomed to working in our buildings and well versed in our norms and standards, and we can guarantee that the job will be done right.” Businesses wishing to prepare office space can simply present their plans, challenges, and requirements to the SITQ team. Team experts will then take charge of planning, tender management, and work supervision in full compliance with the plans and specifications, as well as provide rigorous oversight of timetables, budgets, and the quality of the work. Moreover, the construction team ensures that all required documents are obtained and transmitted to the client—including letters of compliance to the CSST and CCQ, letters of guarantee, final acquittance, equipment maintenance manuals, etc.—in order to facilitate office operation and reduce business risk. Paying special attention to the environment When we undertake leasehold improvements, retrofitting, or deconstruction work, we pay particular attention to environmental protection. We are constantly seeking ways to salvage, reuse, and recycle,” said Christian Ducharme. When possible, instead of sending the waste material to the dump, the team asks the contractor to sort through the material and redirect as much as it can to be recycled. What’s more, whatever can be reused is saved, including doors and frames, metal studs, wiring, electrical switches, and more. “We recently recruited a building mechanical engineer who has LEED® Professional Accreditation from Canada Green Building Council (CaGBC), and several project managers are currently undergoing accreditation. We are also developing environmental specifications that will apply to all our projects. We are committed to developing environmentally friendly practices for implementation at every stage of our projects,” concluded Mr. Ducharme. La mise en lumière de l’édifice Price... (suite de la page 1) Illumination of the Price Building... (continued from page 1) Ainsi, le concept permettra de découper la silhouette de l’édifice, d’exploiter ses particularités architecturales, d’accentuer ses détails de maçonnerie, de créer un repère dans le paysage urbain et d’intégrer cet immeuble phare au magnifique environnement du VieuxQuébec. La mise en lumière de la toiture sera assurée par un éclairage à diodes (DEL), spécialement modifié pour cette application. Chaque modulation du système comprendra 16 millions de couleurs, de façon à pouvoir garder un rendu toujours identique, en dépit du phénomène d’oxydation qui modifie la teinte du toit de cuivre avec le temps. Le système permettra également d’obtenir la même tonalité sur les pierres du bâtiment. Le système de mise en lumière sera composé de sources lumineuses peu énergivores et nécessitera un minimum d’entretien, particulièrement dans les endroits difficiles d’accès. SITQ est donc très fière de ce projet dont les travaux seront réalisés de février à mai. L’inauguration officielle de la mise en lumière est prévue dans la soirée du 18 juin 2008, en présence de plusieurs dignitaires. The illumination will emphasize the building’s silhouette, highlight its special architectural features, and accentuate masonry details, creating a reference point in the urban landscape and integrating this well-known landmark into the Old City’s magnificent environment. Specially modified LED lights will light up the roof. Each modulation of the system will include 16 million colors to ensure the result is always the same, despite gradual changes in the color of the copper roof due to oxidation. The system will also ensure the stones of the building are uniform in hue. The illumination system boasts energy efficient lighting requiring minimum maintenance, particularly in the hard-to-reach areas. SITQ is very proud of this innovative project, which will be carried out between February and May. Official illumination is slated for the evening of June 18, 2008, in the presence of numerous dignitaries. 3 NOS RÉCENTES TRANSACTIONS la jonction du quartier TriBeCa et du World Financial Center, et bénéficient de l’une des plus belles vues du port de New York. d’investissements mis en place avec USAA Real Estate Company et visant des immeubles loués à des agences gouvernementales américaines. Pour SITQ, cette acquisition représente une excellente occasion d’accroître son portefeuille new-yorkais, aux côtés d’un partenaire avec qui elle connaît beaucoup de succès. Citibank Towers, New York À la fin du mois de décembre, SITQ et son partenaire SL Green ont conclu l’acquisition des Citibank Towers, deux immeubles de prestige du sud de l’île de Manhattan. Les quotes-parts des deux entreprises dans cette transaction sont respectivement de 49,4 % et 50,6 %. Il s’agit de la plus grande transaction visant une seule propriété sur le marché de Manhattan en 2007. Entièrement occupés par Citigroup, les édifices de 40 étages (388 Greenwich Street) et 10 étages (390 Greenwich Street) totalisent plus de 2,6 millions de pieds carrés. Ils forment un ensemble situé aux abords de la rivière Hudson, à SITQ consolide sa position dans le marché de Washington avec l’acquisition d’un intérêt de 29.77 % en partenariat avec Tishman Speyer, Lehman Brothers & al. dans un portefeuille comportant 27 immeubles répartis dans la région de Washington, D.C., Northern Virginia et Maryland. Par ailleurs, deux édifices à bureaux ont été acquis récemment ailleurs aux États-Unis : • le Perimeter Center, situé à Richmond, en Virginie, compte 177 185 pieds carrés sur 4 étages; • le 801 K Street de Sacramento, en Californie, offre 336 000 pieds carrés sur 28 étages. SITQ détient une participation de 49 % dans ces deux propriétés. Les transactions ont été réalisées dans le cadre d’un programme Sacramento, Californie UN PROGRAMME DE PRÉVENTION DES INCENDIES QUI SE DÉMARQUE, AU PROFIT DES OCCUPANTS DES IMMEUBLES! Saviez-vous que l’équipe responsable de la prévention des incendies réalise régulièrement des tests pour assurer la sécurité des locataires de ses immeubles ? En effet, SITQ a mis en place un programme très sophistiqué dans le domaine, qui va bien au-delà de ce qui se fait dans la majorité des édifices au Québec. « La prévention incendie chez SITQ s’articule autour de deux grands axes, soit la vérification des systèmes de protection incendie et la promotion de la prévention par l’entremise de formations », résume Éric Lajeunesse, Technicien, Prévention incendie. Ainsi, en matière de formation, les locataires sont informés à chaque 4 année des mesures d’urgence à prendre en cas d’incendie, ainsi que des moyens à privilégier en matière de prévention. SITQ offre également des formations aux personnes à mobilité réduite, puisqu’elles font l’objet de mesures particulières en cas d’évacuation d’un édifice en hauteur. À tous les ans, les équipes de SITQ participent également à des simulations de début d’incendie, qui les amènent à intervenir avec des extincteurs portatifs, ainsi qu’à des exercices d’appel à la bombe ou de découverte de colis suspect. Au chapitre des vérifications, des essais sont réalisés quand les occupants ont quitté leurs bureaux. Jusqu’à 71 éléments reliés aux systèmes de protection incendie sont testés afin de vérifier leur bon fonctionnement. Chaque immeuble reçoit un pointage en fonction des résultats obtenus, grâce à une grille interactive mise à jour à tous les trois mois. Les fréquences établies sont parfois plus sévères que les normes nationales en vigueur. Cette façon de faire constitue donc une réelle avancée en matière de sécurité. Depuis quelques années, les équipes de sécurité et prévention de SITQ travaillent en étroite collaboration avec les services d’incendies de Montréal et de Québec. Des rencontres ont été réalisées avec des responsables de sécurité du centreville et des gestionnaires d’immeubles pour expliquer le déroulement détaillé d’une intervention. Ceux-ci sont donc informés des éléments qu’ils devront prendre en considération pour bien répondre aux besoins des services d’urgence. Certains immeubles de SITQ sont également utilisés par les écoles de pompiers afin de simuler des interventions dans un édifice en hauteur. « Cette année, notre préoccupation sera de promouvoir plus en profondeur la prévention auprès des occupants de nos immeubles », indique M. Lajeunesse. « Actuellement, les personnes responsables de diriger les gens en cas d’évacuation assurent la diffusion de l’information relative à la prévention au sein de leur entreprise. Nous souhaitons maintenant améliorer ce système et ajouter de nouveaux outils en cours d’année, afin d’informer tous les occupants de façon régulière. » OUR RECENT TRANSACTIONS At the end of the month of December, SITQ and its partner SL Green acquired two prestigious south Manhattan buildings from Citibank. The share breakdown for the two companies in this transaction is 49.4% and 50.6%, respectively. This acquisition was the largest transaction for a single property in the Manhattan market in 2007. Together, the 40 story building (388 Greenwich Street) and 10 story building (390 Greenwich Street) total over 2.6 million square feet. Occupied solely by Citigroup, the complex is located along the Hudson River at the juncture of the TriBeCa neighborhood and the World Financial Center and boasts one of the most beautiful views of New York Harbor. For SITQ, this acquisition is an excellent opportunity to expand its New York portfolio in conjunction with a partner with whom we enjoy considerable success. SITQ has consolidated its position in the Washington market through the joint acquisiton of a 29.77% financial interest in a 27-property portfolio in partnership with Tishman Speyer, Lehman Brothers & al. The properties are located in Washington, D.C., Northern Virginia, and Maryland. In addition, two office buildings were recently acquired in the United States: • The Perimeter Center, located in Richmond, Virginia, which boasts 177,185 square feet on 4 floors. • 801 K Street in Sacramento, California, a 28 story tower totalling 336,000 square feet of space. SITQ holds a 49% share in both of these properties. The transactions were conducted as part of an investment program implemented with USAA Real Estate Company targeting buildings leased to U.S. government agencies. New York A STANDOUT FIRE PREVENTION PROGRAM FOR THE BENEFIT OF BUILDING TENANTS! Did you know that the SITQ fire prevention team conducts regular tests to ensure its tenants’ safety? In fact, SITQ has implemented a very sophisticated prevention program that goes far beyond those in place at the majority of buildings in Montréal and Québec City. “SITQ’s fire prevention program is built around two main priorities: fire prevention system inspection and fire prevention training and promotion,” summarized fire prevention technician Éric Lajeunesse. With respect to the training area, tenants are informed every year about the emergency measures to take in case of fire as well as fire prevention steps. In addition, SITQ offers training for people with limited mobility, as they require special measures when evacuating a tall building. SITQ teams also take part in small fire simulations to practice using portable fire extinguishers and carry out bomb threat and suspect package response drills. System inspections are made after office hours. Up to 71 fire protection system elements are tested in order to ensure they are functioning properly. Each building is awarded a number of points depending on the test results, using an interactive chart that is updated every three months. Testing timetables are often more strict than the national standards in effect. Thus, the SITQ program offers a real safety advantage. For several years, SITQ safety and prevention committees have worked in close cooperation with the Montréal and Québec City fire departments. Meetings have been held with downtown security officials and building managers to explain the emergency response plan in detail. In this way, managers know what to keep in mind in order to comply with the needs of emergency responders. As well, certain SITQ properties are used for tall building simulations by firefighter training programs. “This year we will focus even more on promoting prevention with our tenants,” stated Mr. Lajeunesse. “Presently, the people responsible for coordinating evacuations ensure that preventionrelated information is distributed to everyone in their business. We now hope to improve this system, adding new tools over the course of the year, to ensure that all occupants are regularly informed.” In short, thanks to the hard work of its fire prevention teams, SITQ hopes to establish benchmark standards for fire prevention and safety in tall buildings. 5 BENTALL CENTRE, UN COMPLEXE DE CINQ IMMEUBLES DE BUREAUX AU CENTRE-VILLE DE VANCOUVER 2 millions de pieds carrés, bénéficient d’un emplacement privilégié, en plein cœur du centre des affaires (CBD), et d’une finition de qualité supérieure. Situées sur un terrain de cinq acres, les quatre phases originales du complexe sont interreliées par un mail commercial intérieur de 123 000 pieds carrés offrant plusieurs services, tels restaurants, banques, pharmacie, bureau de poste et un accès direct au train aérien, qui dessert le district régional du Grand Vancouver. D’autres commerces et établissements de service sont situés au rez-de-chaussée des édifices ainsi que dans deux pavillons sur la terrasse extérieure. Construites entre 1966 et 1981, les quatre tours comptent entre 18 et 35 étages et bénéficient de vues imprenables sur les montagnes rocheuses et le port de Vancouver. La tour 5 de Bentall Centre / Bentall Centre Tower 5 Plus grand complexe de bureaux intégré de l’Ouest canadien, Bentall Centre est l’adresse de prestige à Vancouver. Ses cinq immeubles, qui totalisent plus de Par ailleurs, la tour 5 de Bentall Centre a été érigée en deux temps. La première phase, achevée en 2002, offre une superficie locative de quelque 345 000 pieds carrés sur 23 étages. Les deux derniers étages avaient toutefois été laissés intentionnellement vacants, en prévision de l’ajout éventuel de 11 étages additionnels totalisant 243 000 pieds carrés. À la faveur d’un marché propice et en pleine croissance, les travaux d’érection de la phase 2 ont donc été entrepris en 2005 et le projet a attiré rapidement les locataires. Planifiés pour minimiser les impacts sur les locataires, ils ont été d’abord réalisés en dehors des heures d’affaires, jusqu’à ce que les premiers étages soient terminés. Le défi était de taille : ajouter une nouvelle structure de 11 étages au-dessus d’un immeuble opérationnel et occupé à 100 %, sans interrompre l’activité des locataires. Ce projet de tour en hauteur, malgré sa complexité, a été complété avec succès en 2007, tandis que le pavillon de 6 800 pieds carrés situé au niveau du sol sera terminé au printemps de 2008. Ce magnifique immeuble de verre, qui totalise maintenant 588 000 pieds carrés répartis sur 34 étages, offre une vue exceptionnelle de toutes les orientations et est entièrement loué. BENTALL CENTRE, A FIVE-BUILDING OFFICE COMPLEX IN DOWNTOWN VANCOUVER Bentall Centre, the largest integrated office complex in Western Canada, is Vancouver’s signature address. Its five buildings, totalling over 2 million square feet, are prominently located in the heart of the central business district (CBD) and feature top quality amenities. Situated on a five-acre site, the original four structures in the complex are interconnected by a 123,000 square foot underground mall that offers a broad range of services including restaurants, banks, drugstore, post office, and a direct access to SkyTrain, which serves metro Vancouver. Other business and service establishments are located on the ground floors of the towers, as well as in two buildings adjacent to the outside plaza. Constructed between 1966 and 1981, the four towers rise from 18 to 35 stories high and enjoy sweeping views of the Coast Mountains and port of Vancouver. Bentall Centre Tower 5 was erected in two phases. The first phase, completed in 2002, comprised 23 floors with 345,000 square feet of rental space. However, the last two stories were intentionally left vacant in anticipation of a possible 11 story, 243,000 sq. ft. addition. Encouraged by a favorable market experiencing robust growth, the second phase of construction began in 2005, rapidly attracting tenants. The project was planned in such a way as to minimize impact on tenants, with the initial work done primarily outside of business hours. Adding a new 11 story structure to an already operational and fully occupied building without interrupting tenant activities was a substantial challenge. This magnificent glass-sheathed tower, which now totals 588,000 square feet Despite its complexity, the project’s high rise tower was successfully completed in 2007 and the 6,800 sq. ft. ground level pavilion will be complete in spring 2008. Bentall Centre 6 and 34 floors, offers superb views in all directions and is fully leased. POINTS DE VUE POINTS OF VIEW SITQ PARTICIPE AU PROJET PILOTE LEED COMPLETE Le Conseil du bâtiment durable du Canada (CBDCa) a mis en branle récemment le projet pilote LEED Complete, qui consiste à développer une certification environnementale ciblant toutes les phases de vie d’un édifice, soit du design à la rénovation, en passant par la construction et l’entretien. L’initiative vise à modifier le système d’évaluation LEED® Canada afin qu’il s’applique à un plus grand nombre d’immeubles et qu’il offre une plus grande valeur aux propriétaires et aux exploitants. La nouvelle certification LEED devrait être lancée en 2009. Elle comportera de nombreuses améliorations et offrira de nouvelles caractéristiques qui auront préalablement été testées dans le cadre de projets pilotes qui se dérouleront à la grandeur du pays et qui mettront à contribution les propriétaires et exploitants d’environ 150 édifices publics et 20 immeubles commerciaux, en plus d’une centaine de commissions scolaires. SITQ, déjà engagée fermement dans la gestion environnementale et dont tous les immeubles au Québec sont certifiés Visez vert Plus, compte parmi les participants à ce projet pilote. « La certification environnementale LEED existe depuis une dizaine d’années et comprend différentes normes », souligne Guy Lamarre, directeur général, Gestion immobilière, SITQ. « Toutefois, la LEED EB, pour les immeubles existants, n’est pas en place au Canada. Pour l’obtenir, il faut donc utiliser le système de certification américain, ce qui n’est pas idéal compte tenu des différences de contexte entre les deux pays, notamment au niveau du climat. Ce projet permettra de corriger cette lacune tout en assurant une mise à niveau nécessaire après 10 ans d’existence. » Ainsi, quelques membres de l’équipe de la gestion immobilière de SITQ participeront aux différents groupes de travail qui seront mis en place par le CDBCa. Dans la lignée de ses initiatives vertes, la Société a inscrit deux de ses immeubles au processus d’accréditation dans le cadre du projet pilote, soit le Centre CDP Capital de Montréal et la tour 5 de Bentall Centre de Vancouver. Un projet prometteur Selon le Worldwide Green Building Council, l’un des fondateurs de la certification LEED, les édifices seraient responsables de 33 % des émissions de CO2. Les immeubles verts constituent donc l’un des éléments déterminants de la solution aux problèmes environnementaux de la planète. Or, l’un des objectifs de la modification aux normes LEED consiste à s’assurer que non seulement les immeubles sont construits en respectant les principes de protection de l’environnement et d’efficacité énergique, mais qu’ils respectent toujours des critères rigoureux en la matière une fois qu’ils sont occupés. De plus, un troisième niveau de certification permettra de valider les pratiques de gestion et d’exploitation qui y sont appliquées. Par ailleurs, dans le cadre de ce projet pilote, les critères d’évaluation tiendront dorénavant compte du contexte dans lequel se trouve l’immeuble, afin d’éviter l’utilisation d’un système universel. En somme, il s’agit de rendre le processus plus convivial, tout en conservant la même rigueur qui a fait la renommée de LEED. SITQ PARTICIPATES IN LEED COMPLETE PILOT PROJECT The Canadian Green Building Council (CaGBC) recently kicked off its pilot LEED Complete project, which will develop environmental certification for all phases of a building’s life cycle— from design to renovation—including construction and maintenance. The goal of the project is to modify the LEED® Canada evaluation system so that it can be used by more buildings and offer more value to owners and property managers. The new LEED certification is slated for launch in 2009. It will include numerous improvements and new features tested on pilot projects now underway across the country. The projects involve owners and developers of nearly 150 public and 20 commercial buildings in addition to one hundred school boards. SITQ, which has already made environnemental management a priority by having all of its buildings in Québec certified “Go Green Plus”, is among the pilot project participants. “LEED environmental certification has been around for ten years or so, and includes various standards,” said Guy Lamarre, SITQ’s General Manager of Real Estate Management. “However, there is no Canadian version of LEED-EB certification for existing buildings. To obtain it, the U.S. certification system has to be used, which is not ideal given the differences between the two countries, especially where climate is concerned. This project will remedy that shortcoming and ensure that the upgrade needed after 10 years takes place.” As part of the project, several members of SITQ’s property management team will take part in various work groups to be implemented by CaGBC. In keeping with its green initiatives, two SITQ buildings have been enrolled in the pilot project accreditation process, the CDP Capital Centre in Montréal and the Bentall Centre Tower 5 in Vancouver. A promising project According to the Worldwide Green Building Council, which played a founding role in LEED certification, buildings are responsible for 33% of CO2 emissions. Green buildings thus represent one of the keys to solving the planet’s environmental problems. One of the objectives of the modified LEED standards is to make sure that not only are energy efficient buildings constructed in compliance with environmental protection principles, but that they remain in compliance with rigorous criteria once occupied. Further, the third level of certification will examine building management and operating practices. Moreover, pilot project evaluation criteria will now take building settings into consideration, to avoid using a one-size-fits-all approach. In short, the process will be made more userfriendly while maintaining the high quality standards that are already synonymous with LEED. 7 VUE PANORAMIQUE PANORAMIC VIEW TECK COMINCO Société détient une participation de 20 % dans le projet Forth Hills ainsi qu’un intérêt de 50 % dans d’autres sites de prospection de la région d’Athabasca, en Alberta. Inscrite à la cote de la Bourse de Toronto et à celle du New York Stock Exchange, Teck Cominco emploie plus de 10 000 personnes dans quelque 50 sites situés dans 14 pays. Entreprise minière et de métallurgie diversifiée, Teck Cominco est un chef de file mondial de la production de zinc et de charbon métallurgique, en plus d’être un important producteur de cuivre, d’or et de métaux de spécialité. Dans le domaine des sables bitumineux, la De plus, Teck Cominco fait de l’exploration sur les quatre continents. À cet égard, elle a connu plusieurs succès et fait la découverte de sites importants au cours des dernières années, en collaboration avec d’autres sociétés minières, notamment deux gisements d’or en Alaska et au Mexique et un gisement de sulfure massif volcanogène (SMV) au Mexique. deuxième phase de la tour 5 du Bentall Centre, dans le quartier des affaires de Vancouver. Ce locataire de renom est d’ailleurs en train d’aménager un emplacement de détente de 350 pieds carrés sur le toit de l’immeuble, qui sera surmonté d’une terrasse d’égale dimension. L’endroit sera nommé The Headframe, d’après le nom de la structure qui chapeaute une mine souterraine et qui est utilisée pour accueillir les mineurs et leurs équipements lors de leurs descentes et remontées. En 2007, Teck Cominco a fait un don de 10 M$ au Musée royal de l’Ontario (MRO) – le plus grand don corporatif de l’histoire du Musée – pour y mettre en place trois galeries consacrées aux sciences de la Terre et pour engager un conservateur pour ce type d’exposition. Aujourd’hui, l’entreprise travaille en collaboration avec le Musée pour concevoir une aire d’exposition qui sera installée dans le Headframe de la tour 5 du Bentall Centre et qui reprendra certains éléments audio-visuels utilisés dans les nouvelles galeries du MRO. En somme, non seulement Teck Cominco est-elle un locataire de renom, mais elle apporte une valeur ajoutée au sein de ce magnifique immeuble du centre-ville de Vancouver ! Près de 250 personnes travaillent au siège social de Teck Cominco, qui est installé aux cinq derniers étages de la TECK COMINCO A diversified mining and metals company, Teck Cominco is a world leader in zinc and metallurgical coal production, as well as a major producer of copper, gold, and specialty metals. The company holds a 10% interest in the Fort Hills Oil Sands project and has a 50% interest in other prospective oil sands leases in the Athabasca region of Alberta. Teck Cominco is listed on the Toronto and New York stock exchanges and has over 10,000 employees at some 50 sites in 14 countries. Teck Cominco also has a successful track record in exploration on four continents and has made a number of major discoveries in recent years in cooperation with other mining companies— notably two gold deposits in Alaska and Mexico and a volcanogenic massive sulfide (VMS) deposit in Mexico. With nearly 250 employees, Teck Cominco’s head office is located on the top five floors of Bentall Centre Tower 5 Phase II in Vancouver’s business district. The well-known tenant is currently adding a 3,500 sq. ft. amenity space on the building’s roof, which will be topped with a terrace of the same size. This area will be known as The Headframe after the structure at the top of an underground mine where miners and equipment are raised and lowered into the shaft. 8 In 2007, Teck Cominco donated $10 million to the Royal Ontario Museum (ROM)—the largest corporate donation in the museum’s history— to create three galleries devoted to earth sciences and provide an endowment for a curator for the exhibits. Today, Teck Cominco is working in cooperation with the ROM to design an exhibit area in the Headframe at Bentall Centre Tower 5. This new space will incorporate certain audio-visual elements already in use in the museum’s new galleries. In conclusion, not only is Teck Cominco a renowned tenant, but it is also contributing added value to a magnificent landmark in downtown Vancouver!
Documents pareils
CHEF DE FILE PLUS THE LEADER PLUS
Montréal (Québec) H3B 2E7
Téléphone : 514 861.9393
Télécopieur : 514 861.4560
Courriel : [email protected]
Spring 2007
The Leader Plus
is produced and published by the Marketing Service.
SITQ
Head offi...
CHEF DE FILE PLUS
Montréal (Québec) H3B 2E7
Téléphone : 514 861.9393
Télécopieur : 514 861.4560
Courriel : [email protected]
Fall /Winter 2006
The Leader Plus
is produced and published by the Marketing Service.
SITQ
Hea...
CHEF DE FILE PLUS THE LEADER PLUS
1001 Square-Victoria
Montréal, QC H2Z 2B1
Editor in Chief: Christiane Sauvé,
Marketing and Market Research Advisor
Writing: Sarah Marchand
Design, production and printing:
LXB Communication Marketi...
CHEF DE FILE PLUS THE LEADER PLUS
d’immeubles, AXIMA is now the Québec leader in technical infrastructure
management, notably with respect to buildings and airport infrastructures.
As Yves-André Godon, SITQ senior vice-president, C...