Operation and maintenance
Transcription
Operation and maintenance
Contents / Matieres Poster session / Séance d’affiches Chairman/Président: Dr. Nirmal Chatterjee, Air Products and Chemicals, Inc. Vice-Chairmen/Vice-Présidents: Kazuo Kakehashi, Osaka Gas Co., Ltd. William Kennington, Air Products and Chemicals, Inc. Operation and maintenance/Opération et maintenance PO-21 APPLICATION OF RBM TO HIMEJI LNG RECEIVING TERMINAL AND THE EFFECTIVENESS IN MAINTENANCE COST REDUCTION EFFORT POUR REDUIRE LES COÛTS DE MAINTENANCE EN UTILISANT LA METHODE MBR AU LE TERMINAL GNL DE HIMEJI ET LES RESULTATS OBTENUS Yasutaka Matsumura, Hiromasa Otsuka, and Masahiko Moritsugu, The Kansai Electric Power Co., Inc. PO-22 ADVANCED RISK ASSESSMENT OF LNG STORAGE TANKS BASED ON RISK-BASED MAINTENANCE PLANNING EVALUATION AVANCEE DE RISQUES DE BACS DE STOCKAGE GNL AU MOYEN D’UN PLANNING DE MAINTENANCE BASEE SUR RISQUE Hajime Anzai, Masayuki Kobayashi, and Tsuyoshi Endo, Nihonkai LNG Co., Ltd.; and Jun Takahashi, Takashi Ibata, Hideaki Nakamura, Dr. Akio Fuji, Isho Nakachi, Tatsuo Tsuji, and Masaki Torigoe, Ishikawajima-Harima Heavy Industries Co., Ltd. PO-23 DEVELOPMENT OF TECHNOLOGIES FOR DIAGNOSIS OF DEGRADATION IN SERVICE OF STAINLESS STEEL EQUIPMENT IN LNG TERMINALS DEVELOPPEMENT D’UNE TECHNOLOGIE POUR LE DIAGNOSTIC DE DEGRADATION DANS LE SERVICE DE L’EQUIPEMENT EN ACIER INOXYDABLE AUX TERMINAUX DE GNL Shinichi Ito, Tokyo Gas Co., Ltd.; and Yutaka Arai, Tokyo Rigaku Kensa Co. PO-24 UPGRADING LNG TERMINAL OPERATION CONTROL SYSTEM TO A SYSTEM ADAPTABLE TO FUTURE EXPANSION AT MINIMAL COST—SYSTEM REPLACEMENT AT SENBOKU LNG TERMINAL I RENOUVELLEMENT DU SYSTÈME DE GESTION DE L’EXPLOITATION DU TERMINAL DE GNL AVEC POUR OBJECTIF LA REDUCTION DU COÛT ET LA REALISATION DE LA CAPACITE EVOLUTIVE—UN EXEMPLE DU TERMINAL DE SENBOKU Hiroshi Fukumoto, Hisato Inoue, Yoshiki Matsushima, Susumu Takebe, and Haruhito Matsunami, Osaka Gas Co. Ltd. PO-25 IMPACT OF SEA COOLING WATER (SCW) MANAGEMENT AND HEAT EXCHANGER DESIGN ON TUBE FAILURE IN ONCE-THROUGH SEA COOLING WATER SYSTEM L'IMPACT DE LA GESTION DE L'EAU DE REFROIDISSEMENT DE MER (SCW) ET LE DESSEIN DE L'ECHANGEUR DE CHALEUR SUR UNE PANNE DE TUBE DANS UNE SYSTÈME OU L'EAU DE REFROIDISSEMENT DE MER PASSE QU’UNE FOIS À TRAVERS Kua Siong Yan, Wan Badrul Hisham B Wan Abdullah, and Baharom B Che Isa, Malaysia LNG Sdn. Bhd. PO-26 HOW TO OPERATE LNG RECEIVING TERMINALS WITH FLEXIBILITY / SAFETY DESPITE THE DIVERSIFICATION OF UNLOADED LNG'S QUALITIES COMMENT EXPLOITER DES TERMINAUX METHANIERS AVEC FLEXIBILITE / SECURITE MALGRE LA DIVERSIFICATION DES QUALITES DE GNL DECHARGES Olivier Gorieu and Dominik Uznanski, Gaz de France; and Pascal Dupont, Laboratoire Thermocinétique, UMR CNRS1 MAIN SESSIONS PO-27 INVESTIGATIONS INTO THE AGING EXTENT OF THE 9% NICKEL 500 M3 LNG STORAGE TANK OF THE NANTES CRYOGENIC TESTING STATION INVESTIGATIONS SUR LE DEGRE DE VIEILLISSEMENT DU RESERVOIR GNL DE 500 M3 EN ACIER 9% NICKEL DE LA STATION D’ESSAIS CRYOGENIQUE DE NANTES Dominik Uznanski, Olivier Gorieu, Y. Yang, M. Yamashita, J. Cherasse, S. Jana, D. Geominne, and J. Y. Capelle, Gaz de France PO-28 A PLAN FOR OPERATING COST REDUCTION AND TECHNOLOGY DEVELOPMENT OF LNG VAPORIZING SYSTEM PLAN DE REDUCTION DES COÛTS D’OPERATION ET DE DEVELOPPEMENT DES TECHNOLOGIES POUR LE SYSTEME DE VAPORISATION DU GNL Ho-Yeon Kim, Jeong-Hwan Lee, Dong-Hyuk Kim, Young-Soon Baek, Kwang-Won Kim, and Ki-Hwan Park, Korea Gas Corporation MAIN SESSIONS
Documents pareils
plan for the installation of a power plant using lng cold energy at an
Osaka Gas Co., Ltd. a installé une centrale électrique dans l’un terminal de GNL et a commencé la
vente en gros d’électricité en Juillet 2002. La construction de centrales électriques sur les lieux...