Toon Boom Manager User Guide

Transcription

Toon Boom Manager User Guide
User Guide
Legal Notices
Toon Boom Animation Inc.
4200 Saint-Laurent, Suite 1020
Montreal, Quebec
Canada H2W 2R2
Tel: +1 514 278 8666
Fax: +1 514 278 2666
toonboom.com
Disclaimer
The content of this manual is covered by a specific limited warranty and exclusions and limit of liability under the
applicable License Agreement as supplemented by the special terms and conditions for Adobe® Flash® File
Format (SWF). Please refer to the License Agreement and to those special terms and conditions for details.
The content of this manual is the property of Toon Boom Animation Inc. and is copyrighted. Any reproduction
in whole or in part is strictly prohibited. For further information, please contact Toon Boom Animation Inc. at the
Corporate Headquarters address.
Copyright © 2012 Toon Boom Animation Inc., a Corus® Entertainment Inc. company. All rights reserved.
Trademarks
Toon Boom® ManagerTM is a trademark owned by Toon Boom Animation Inc. All other trademarks are the property
of their respective owners.
Credits
Documentation Development: Pamela Grimaud, Marie-Eve Chartrand
Content Development: Jean-Raymond Lemieux
Art Development: Tania Gray
Publication Date
May 2012
Contents
Legal Notices.......................................................................... 2
Scenes Description............................................................... 25
Overview......................................................................... 5
Time ................................................................................... 26
Login............................................................................... 6
Search Scenes....................................................................... 27
Getting Around in Manager............................................ 7
Filter ................................................................................... 28
A Map of Manager.......................................................... 8
Expanded Filter.................................................................... 29
Home Page...................................................................... 9
Update.................................................................................. 30
Home Page Interface............................................................ 10
Expanded Update................................................................. 31
Home Page Description....................................................... 11
Issues and Comments........................................................... 32
Admin Page................................................................... 12
Legend and Job Overview................................................... 33
Admin Page Description....................................................... 13
Scene Notes.......................................................................... 34
Data Structure............................................................... 14 Scene Page.................................................................... 35
Project Page.................................................................. 15
Scene Page Interface............................................................ 36
Project Page Interface.......................................................... 16
Navigation............................................................................ 37
Project Page Description...................................................... 17
Status................................................................................... 38
Report and Maintenance Access.......................................... 18
Scene Clips........................................................................... 40
Job Page....................................................................... 19
Scene Clip - See All.............................................................. 41
Job Page Interface................................................................ 20
Scene Note........................................................................... 42
Job Page Description........................................................... 21
What Do You Want To Do?........................................... 43
Report and Maintenance Access.......................................... 22
Creating a New User..................................................... 44
Job Details............................................................................ 23
Creating a New Project................................................. 46
Scenes Interface.................................................................... 24
Configuring Integrated Software.................................. 48
Toon Boom Manager User Guide
3
Configuring a Project.................................................... 51
Key Concept: Approval Status...................................... 86
Adding Team Members to a Project............................. 53
Key Concept: Comments.............................................. 87
Adding Stages to a Project........................................... 55 Key Concept: Conditions.............................................. 88
Editing the Stages for a Project.................................... 58 Key Concept: Issues...................................................... 89
Adding Conditions to a Project.................................... 60 Key Concept: Job.......................................................... 90
Editing Conditions for a Project.................................... 62
Key Concept: Project.................................................... 91
Adding Issues to a Project............................................ 64
Key Concept: Scene...................................................... 92
Adding Global Stages................................................... 66 Key Concept: Stages..................................................... 93
Adding Global Conditions............................................ 67
Key Concept: Stage Dates............................................ 94
Adding Global Issues.................................................... 68
Key Concept: Weight.................................................... 95
Adding a Job................................................................. 69
Index............................................................................. 96
Adding Scenes.............................................................. 71
Appending Scenes................................................................ 72
Inserting Scene..................................................................... 73
Importing Scenes.................................................................. 74
Adding Acts.................................................................. 76
Editing Preferences....................................................... 78
Printing Reports............................................................ 79
Removing a User From a Project................................... 80
Deleting a Scene........................................................... 82
Deleting a Job............................................................... 83
Deleting a Project......................................................... 84
Key Concept: Active/Inactive........................................ 85
Toon Boom Manager User Guide
4
Overview
Overview
Toon Boom Manager is a web-based production-tracking tool. It was originally developed
in a genuine 2D animation production environment. It allows projects to be imported from
Toon Boom Storyboard Pro and integrated with Toon Boom Harmony. This highly-customizable
tool can also be used on its own to track any linear production process such as 3D animation,
stop-motion, or a hybrid production.
This online manual will introduce you to Toon Boom Manager’s basic functions and get you off to
a speedy start.
Read more:
• Login, on page 6
• Getting Around in Manager, on page 7
• A Map of Manager, on page 8
Toon Boom Manager User Guide
5
Login
Login
You will need to use an internet browser to access Manager. The access URL will be provided to
you either by your superior, or the system administrator. On the main access page, you will be
prompted to provide a username and a password to gain access to Manager.
If you are the system administrator and are accessing Manager for the first time, use the following
username and password:
• Username: admin
• Password: admin
Your first task will be to change the admin password to something more secure.
To change the admin password:
1.
2.
3.
4.
5.
In the Menu toolbar, click on the Admin button.
In the Admin - Main Menu section, click on the Maintain Users link.
In the Admin - User List section, under the User Name column, click on the admin user.
In the Admin - User Maintenance section, in the Password field, type the new password.
Click on the Save button to confirm the operation.
Toon Boom Manager User Guide
6
Getting Around in Manager
Getting Around in Manager
Menu Toolbar
Navigation Toolbar
No matter where you are in Manager, you always have access to the Menu toolbar at the top right
and the Navigation toolbar, just below the Manager logo on the left-hand side.
Menu Toolbar
Use the Menu toolbar to access the following:
• Home Page
• Admin Page
• Profile
• Help
• Logout
More buttons such as Edit or Reports are available, depending on which section you are in.
Navigation Toolbar
The Navigation toolbar is always there to steer you to a specific project and beyond to a specific
job within.
Toon Boom Manager User Guide
7
A Map of Manager
A Map of Manager
To help you navigate.
View Estimated
Stage Dates
Scene Z
Activity Log
Job Maintenance
Scene Clip
(Click on See All)
Job Y
(Click on Edit)
Project – Job – Maintenance
(Click on Add Job)
Project X
Login
Home
Project Maintenance
(Click on Edit)
Team Members
View Users Privilege Details
Users Currently Logged In
Stages
System
Login Audit
Maintain Projects
Add Project
Maintain Users
Add Users
Conditions
Report
Issues
Help
Maintain Integrated
Profile
Global
Software
Add Integrated Software
Maintain Stages
Add Stage
Maintain Conditions
Add Condition
Maintain
MaintainColours
Issues
Add
AddColour
Issue
Admin
Production Data
Related to Specific
Data
Logout
Home
Maintain Colours
Click on the boxes to get more information
Toon Boom Manager User Guide
8
Home Page
Home Page
Once you log into Manager, you will land on the Home page. It has valuable information at the
ready, plus all the links you will need to move forward. Let us begin with a look at the content.
Read more:
• Home Page Interface, on page 10
• Home Page Description, on page 11
Admin
(Global Settings)
(Production
Data)
Project X
(Project Specific
Settings)
Profile
Login
Home
Add Bulletin
Add Job to
Watch List
[+]
Add Scene to
Watch List
[+]
Help
Toon Boom Manager User Guide
9
Home Page
Home Page Interface
1
3
2
4
5
See the description: Home Page Description, on page 11
The Home page is divided in five main areas:
1.
2.
3.
4.
5.
Projects
Job Watch
Bulletins
Scene Watch
User Messages
Toon Boom Manager User Guide
10
Home Page
Home Page Description
1. Projects: Listed here are all the projects to which you have access. Click on the [+] icon of any
project to add one of its jobs to the Job Watch area located below it.
2. Job Watch: This area allows you to create shortcuts to the jobs you will want to access
regularly. Simply click on the [+] icons in the Project area located above Job Watch field.
3. Bulletins: This section is used to communicate information to the entire crew of a project and
is typically used to display reminders.
4. Scene Watch: Any scene currently assigned to you will be automatically listed here. You may
also add any scene you want by selecting it from the [+] icon in the Job Watch section.
5. User Messages: This box can be used to send messages to any other user affiliated with the
same project. Messages will be displayed in the same area.
Toon Boom Manager User Guide
11
Admin Page
Admin Page
It all begins here.
As an administrator user, you will use this page to set up most everything relating to your project.
To access the Admin page:
1. In the Navigation toolbar, click on the Admin button.
Read more:
• Admin Page Description, on page 13
• Data Structure, on page 14
Users Currently
Logged In
System
Login Audit
Home
Toon Boom Manager User Guide
Admin
Maintain Projects
Add Project
Maintain Users
Add Users
Maintain
Integrated
Software
Add Integrated
Software
Maintain Stages
Add Stage
Maintain
Conditions
Add Condition
Maintain Colours
Add Colour
Maintain Issues
Add Issue
12
Admin Page
Admin Page Description
1
2
3
4
5
6
7
8
1. System: This is where you can edit several general parameters: Time Zone, Company Address,
Preview Clips, Billing Functions and Auditing.
2. Maintain Projects: This is where you will create new projects and edit some of their basic
attributes.
3. Maintain Users: This is where you will create users and manage them.
4. Maintain Integrated Software: This is where you can configure Manager to create and delete
jobs and scenes in a Toon Boom Harmony Server.
5. Maintain Stages: You can create global stages from here.
Read more: Key Concept: Stages, on page 93
6. Maintain Conditions: This is where you can create global conditions.
Read more: Key Concept: Conditions, on page 88
7. Maintain Colours: This is where you can add colours to be used for stages or conditions.
These colours are added as a six digits concatenation of the hexadecimal value of R,G,B.
8. Maintain Issues: This is where you can create global issues.
Read more: Key Concept: Issues, on page 89
Toon Boom Manager User Guide
13
Data Structure
Data Structure
Very simple, as it should be.
Scene 001
Job A1
Scene 002
Project A
Scene 001
Job A2
Scene 002
Home
Scene 001
Job B1
Scene 002
Project B
Scene 001
Job B2
Scene 002
Toon Boom Manager User Guide
14
Project Page
Project Page
Project: “A carefully planned collaborative enterprise.”
While this page provides an overall sense of how the project is progressing, it is usually used as
an access point for the project configuration, or as a departure point to the more detailed Job
and Scene pages.
To access the Project page:
1. In the Navigation toolbar, select the project you want to see.
Read more:
• Project Page Interface, on page 16
• Project Page Description, on page 17
• Report and Maintenance Access, on page 18
(Production Data)
Job Y
Project – Job –
Maintenance
[Add Job]
Home
(Job Specific
Settings)
Team Members
View Users
Privilege Details
Project X
Project
Maintenance
[Edit]
Stages
Conditions
Report
Issues
Toon Boom Manager User Guide
15
Project Page
Project Page Interface
2
3
1
4
5
6
7
8
See the description: Project Page Description, on page 17
Toon Boom Manager User Guide
16
Project Page
Project Page Description
1. Project Details: Displays basic information related to the project.
2. Weighted Progress: This represents the cumulative progress for the project.
3.
4.
5.
6.
7.
Read more: Key Concept: Weight, on page 95
Global Filter: Here you can select a stage and/or a condition to view all the relevant scenes
across the various jobs for this project.
Project Contacts: Here you will find a list of the key personnel affiliated with the project.
Title: Here you will find a list of all the active jobs in the project. Simply click on a job title to
access it.
Percent Completed: Displays Graph bars indicating the completion progress for each job.
Add Job: You can click on the Add Job link to add a new job to your project.
Read more: Adding a Job, on page 69
8. Show Inactive: Displays the list of inactive jobs.
Read more: Key Concept: Active/Inactive, on page 85
Toon Boom Manager User Guide
17
Project Page
Report and Maintenance Access
From the top of the Project page you can also access:
• Project Report by clicking on the Report button in the Menu toolbar.
• Project Maintenance page by clicking on the Edit button in the Menu toolbar.
Toon Boom Manager User Guide
18
Job Page
Job Page
Where most of the work gets done.
With its visual representation of all the scenes, colour-coded to indicate current stages in the
pipeline as well as approval status, the Job page is one of your most helpful resources. It is also
the best place to edit multiple scenes at once and locate specific scenes using advanced filtering
capabilities.
Scene Z
Project X
(Related to
Specific Scene)
Job Y
Job Maintenance
[Edit]
To access the Job page:
1. In the Navigation toolbar, select the project containing the job you want to see.
2. In the Project page, under the Jobs - Title section, click on the name of the job you want to
display.
Read more:
• Job Page Interface, on page 20
• Search Scenes, on page 27
• Job Page Description, on page 21
• Filter, on page 28
• Report and Maintenance Access, on page 22
• Update, on page 30
• Job Details, on page 23
• Issues and Comments, on page 32
• Scenes Interface, on page 24
• Legend and Job Overview, on page 33
• Time, on page 26
• Scene Notes, on page 34
Toon Boom Manager User Guide
19
Job Page
Job Page Interface
The Job page is jam-packed with useful information, so we will begin by examining the different
areas.
1
3
2
4
5
6
7
8
9
10
See the description: Job Page Description, on page 21
Toon Boom Manager User Guide
20
Job Page
Job Page Description
1. Job Details: Displays information about the job, such as the cumulative progress and the
deadline.
2. Scenes: Displays a clickable list of all the scenes in this job, or those returned by a search
query, or by a filter.
3. Time: Displays the local time, as well as the time of the last update.
4. Search Scenes: Here you can search for selected scenes, or for a range of scenes. The result
of the search will be displayed in the Scenes area to the left.
5. Filter: Search here by filtering by any combination of stage, issue, act, approval status, user
and conditions. The result of the filter will be displayed in the Scenes area to the left.
6. Update: This is where you update multiple scenes stages, approval status, condition or user.
You may also delete multiple scenes from here.
7. Issues and Comments: Here, you will access special sections to view at once multiple notes,
comments, or open and closed issues.
8. Legend: Displays a colour chart of the different stages. Basically, this is the key to understanding
the colour coding of the scenes. It also contains valuable information about the percentage
and absolute number of scenes at each stage. Note that this section is either collapsed or
expanded according to the user preference, as set in the user’s profile.
9. Job Overview: Displays Graph bars indicating the completion progress of this job, as well as
pie charts of the job per stages and per “On Time” status. Note that this section is also either
collapsed or expanded, according to the user preference.
10.Notes: This is where you add notes to jobs and scenes. This is handy because you can add
similar notes to multiple scenes all at once.
Toon Boom Manager User Guide
21
Job Page
Report and Maintenance Access
From the top of the Job page you can also access:
• Job Report by clicking on the Report button in the Menu toolbar.
• Job Maintenance page by clicking on the Edit button in the Menu toolbar.
Toon Boom Manager User Guide
22
Job Page
Job Details
2
3
5
1
6
4
1. Project: This displays the name of the current project. Click on the project’s name to navigate
all the way up to the top of the current project level.
2. Job: This displays the name of the current job.
3. Printable: This shows or hides the Update area for a more concise printout.
4. Show / Hide Inactive: This displays or hides the scenes that were rendered inactive.
Read more: Key Concept: Active/Inactive, on page 85
5. Weighted Progress: This displays the cumulative progress for the current job.
Read more: Key Concept: Weight, on page 95
6. Start / End Date for the job: This displays the start and end dates as they were selected
when creating the job.
Toon Boom Manager User Guide
23
Job Page
Scenes Interface
2
1
4
5
3
6
7
See the description: Scenes Description, on page 25
Toon Boom Manager User Guide
24
Job Page
Scenes Description
1. Refresh Thumbnails: This reloads the scene thumbnails as they are being displayed.
2. Thumbnail Size: This allows you to display or hide the scene thumbnails. You can choose
between using the main preview clip image of a scene as a small or large thumbnail, or not
to display thumbnails at all.
3. Approval Status: This displays the current approval status of a scene.
Read more: Key Concept: Approval Status, on page 86
4. Scene Checkbox: Check this box to apply changes made in the Update area to the scene.
You can select multiple scenes and apply the changes to all of them at the same time.
5. Scene Link: Click on the scene’s name to navigate to that specific scene’s page.
6. Inactive Scene: When displayed, inactive scenes are shown as strike-through on grey.
Read more: Key Concept: Active/Inactive, on page 85
7. Results per page: You can limit the number of scenes being displayed per page. This is useful
to limit waiting time when large thumbnails are being shown. You can set this parameter in
your preferences in your profile.
Toon Boom Manager User Guide
25
Job Page
Time
1
2
1. Current Time: The local time is displayed as per the time zone set in your user profile.
2. Last Update: This displays the date of the last time someone modified any entry for this job
Toon Boom Manager User Guide
26
Job Page
Search Scenes
2
1
1. Scene Range: This is where you can type the scene you are looking for. You can enter the
following:
• Single scene
• Multiple scenes separated by comas (,)
• Range of scenes separated by a dash (-)
2. Search: The result will be displayed in the Scenes area when you click on the Search button.
Here is a search result example:
Toon Boom Manager User Guide
27
Job Page
Filter
9
1
2
3
7
4
5
6
7
8
The filtering capabilities are a critical part of Manager. To use the Filter interface, select the
attributes you require, then click on the Filter button to view the corresponding scenes in the
Scenes area on the left-hand side. Note that you can filter using multiple parameters, which will
serve to narrow the results.
1.
2.
3.
4.
5.
6.
7.
8.
Stage: In the drop-down menu, choose a stage to filter by.
Issue: In the drop-down menu, choose an issue to filter by.
Act: In the drop-down menu, choose an act to filter by.
Approval status: In the drop-down menu, choose an approval status to filter by.
User: In the drop-down menu, choose a user to filter by.
Conditions: Check any of the conditions check boxes you want to filter by.
Filter: Click on this button to see the results.
Clear: Click on this button to reset any filtering parameters, as well as the Search Scenes and
Scenes areas. This will effectively list all the scenes of the current job in the Scenes area, short
of display limit and “inactive” restrictions.
9. Expanded Filter: The [+] icon will expand the Filter area to offer more options.
Read more: Expanded Filter, on page 29
Toon Boom Manager User Guide
28
Job Page
Expanded Filter
1
2
3
4
Using the Expanded Filter area, you may filter scenes based on:
1. Estimated Start Date
2. Estimated End Date (for their current Stage)
It is also possible to filter scenes based on:
3. Actual Start Date
4. Actual End Date (for their current Stage).
Learn about Estimated and Actual Stage Dates: Key Concept: Stage Dates, on page 94
Toon Boom Manager User Guide
29
Job Page
Update
8
1
2
4
3
5
6
7
One of the key benefits of the Job page is the ability to update many scenes at once.
To update many scenes at once:
1. In the Stage drop-down menu, select the new stage to be assigned to the selected scenes.
2. In the Approval Status drop-down menu, select the new status to be assigned to the selected
scenes.
3. In the Condition drop-down menu, select the new condition to be assigned to the selected
scenes.
4. In the User drop-down menu, select the new user to be assigned to the selected scenes.
5. In the Scenes area, select all the scenes you want to update. You can also use the Check All
button, after properly searching or filtering the scenes, to display only those to be updated.
6. Click on the Update button to confirm the changes.
7. If you want to delete the selected scenes, click on the Delete button. A confirmation window
will appear to confirm the operation before the deletion occurs.
8. If you want more update options, click on the [+] icon. The Update area will expand to offer
more options.
Read more: Expanded Update, on page 31
Toon Boom Manager User Guide
30
Job Page
Expanded Update
1
2
3
4
5
6
7
8
9
1. Estimated Start Date: This field will allow you to change all the estimated dates for the all
the stages based on the Average duration of each stage, as set in the Stage configuration for
the project. This is very useful for when you need to quickly reschedule a whole job.
The Update Estimated Stage Dates area lets you update the schedule for specific stages for
several scenes.
2. Stage: From the Stage drop-down menu, select the stage you want to update the scenes to.
3. Start Date: In the field, select the start date you want to update the scenes to.
4. End Date: In the field, select the end date you want to update the scenes to.
5. Update Estimated Stage Dates: Click on this button to update the scene’s information.
The Actual Stage Dates concept allows you to acknowledge when the reality differs from the
planning. You can update scenes by:
6.
7.
8.
9.
Stage: From the Stage drop-down menu, select the stage you want to update the scenes to.
Start Date: In the field, select the start date you want to update the scenes to.
End Date: In the field, select the end date you want to update the scenes to.
Update Actual Stage Dates: Click on this button to update the scenes information.
Learn about Estimated and Actual Stage Dates: Key Concept: Stage Dates, on page 94
Toon Boom Manager User Guide
31
Job Page
Issues and Comments
1
2
3
4
The Issue and Comments area is very handy in that it allows you to review comments made by a
specific director, or during a specific period, due to extensive filtering capabilities in Scene Notes.
1. All Notes: Click on this button to see all the notes.
2. Comments/Captions: Click on this button to see the comments and caption notes.
3. Open Issues: Click on this button to see only the Open issues notes.
4. Closed Issues: Click on this button to see only the Closed issues notes.
Clicking on any of the Issues and Comments buttons will take you to the Scene Notes page, which
displays the notes based on your filtering selection.
Toon Boom Manager User Guide
32
Job Page
Legend and Job Overview
The Legend area displays a colour chart of the different scene stages. This is the key to understanding
the colour coding of the different scenes in the project. It also contains valuable information about
the percentage and absolute number of scenes at each stage.
The Job Overview area displays Graph bars indicating the completion progress for this job, as
well as pie charts of the job per stages and per “On Time” status.
Note that both of these sections are either collapsed or expanded, depending on the user
preferences.
Toon Boom Manager User Guide
33
Job Page
Scene Notes
The Notes area allows you to add a comment or an issue to multiple scenes at once.
To add notes to multiple scenes:
1.
2.
3.
4.
In the Scenes area, select the scenes to which you want to add the note to.
In the Scene Notes field, type the note.
In the Comment/Issue drop-down menu, select the type of your note.
Click on the Add to Selected button to add your note to the selected scenes.
Toon Boom Manager User Guide
34
Scene Page
Scene Page
At this level, we are able glean all there is to know about a scene by viewing preview clips of
different versions, consulting the Activity Log to review its history, and much more.
View Estimated
Stage Dates
Job Y
Scene Z
Activity Log
Scene Clip
[See All]
To access the Scene page:
1. In the Navigation toolbar, select the project containing the scene you want to see.
2. In the Project page, under the Jobs - Title section, click on the name of the job containing the
scene you want to display.
3. In the Project - Job section, under the Scenes area, click on the scene’s name to display its
page.
Read more:
• Scene Page Interface, on page 36
• Scene Clips, on page 40
• Navigation, on page 37
• Scene Clip - See All, on page 41
• Status, on page 38
• Scene Note, on page 42
Toon Boom Manager User Guide
35
Scene Page
Scene Page Interface
1
3
2
4
The Scene page’s interface is divided into four main sections:
1.
2.
3.
4.
Navigation, on page 37
Status, on page 38
Scene Clips, on page 40
Scene Note, on page 42
Toon Boom Manager User Guide
36
Scene Page
Navigation
2
1
4
5
3
6
1. Previous scene: Click on the previous scene’s name to navigate back to that scene. The
scenes are organized in alphabetical order.
2. Current scene: This displays the name of the current scene.
3. Next scene: Click on the next scene’s name to navigate forward to that scene. The scenes are
organized in alphabetical order.
4. Current project: This displays the name of the current project. Click on this link to navigate
all the way up to the project level.
5. Current job: This displays the name of the current job. Click on this link to navigate all the
way up to the job level.
6. Percentage Completed: Displays the progress of the current scene through the stages. Note
that the percentage of work at any given stage is only taken into account when the scene
moves ahead to another stage.
Toon Boom Manager User Guide
37
Scene Page
Status
2
1
4
3
5
6
7
8
9
10
11
12
13
14
1. Scene Status: This displays the current scene’s time status.
Read more: Key Concept: Stage Dates, on page 94
2. Activity Log: Click on this link to navigate to a log book, also known as history, of every single
operation that this scene underwent.
3. Current Stage: This displays and allows you to edit the current stage of the scene by selecting
a new stage in the drop-down menu.
Toon Boom Manager User Guide
38
Scene Page
4. Current Stage Status: This displays and allows you to edit the current stage status, also
known as Approval Status, of the current stage.
Read more: Key Concept: Approval Status, on page 86
5. Estimated Stage Dates: This displays and allows you to edit the Estimated Stage Start Dates
and Estimated Stage End Dates. Read about the Stage Dates key concept.
Read more: Key Concept: Stage Dates, on page 94
6. Actual Stage Dates: This displays and allows you to edit the Actual Stage Start Date and
Actual Stage End Date.
Read more: Key Concept: Stage Dates, on page 94
7. View Estimated Stage Dates: Click on this link to navigate to a timeline displaying planned
stages of the current scene.
Read more: Key Concept: Stage Dates, on page 94
8. Duration: This displays and allows you to edit the number of frames in the current scene. The
duration can be imported from Toon Boom Storyboard Pro.
9. Current Condition: This displays a list of all the conditions in which this scene is said to exist.
Read more: Key Concept: Conditions, on page 88
10.Assigned User: This displays the user currently assigned to work on this specific scene.
11.Active Status: This displays the Active status. Inactive scenes are hidden by default.
Read more: Key Concept: Active/Inactive, on page 85
12.Mark Comment: If checked, the current scene will be displayed with a Comment icon in the
Scenes area of the Job page.
Read more: Key Concept: Comments, on page 87
13.Save: Click on this button to confirm the changes to the current scene.
14.Delete: Click on this button to delete the current scene. This option will only be displayed if
the user’s permissions allow it. A confirmation window will appear to confirm the operation.
Toon Boom Manager User Guide
39
Scene Page
Scene Clips
1
2
This is where you can access QuickTime previews of the scene. Note that for scene clips to work,
they must be properly configured.
Read more about Scene Clips Configuration in the Toon Boom Manager Installation manual.
1. Clip Playback: Click on the image to start downloading, then playback the preview as soon
as it becomes available.
2. See All: Click on this button to open a new window that will allow the maintenance of several
versions of that scene’s preview clips.
Read more: Scene Clip - See All, on page 41
Note: Without a “main” clip, the latest clip will be used as the default in the scene page.
Toon Boom Manager User Guide
40
Scene Page
Scene Clip - See All
1
3
2
4
5
7
6
8
1. Image: Select a *.jpg image to represent the clip. If no image is selected, the standard
project image will be used if one is available.
2. Clip: Select a video file to be uploaded as the scene clip. The format of the clips is preset in
the Manager system configuration. The format is generally a *.mov file.
3. Upload: Click on this button to upload the selected movie and preview image files. Check
the Set as Main option if you want the clip to be displayed as the default clip for this scene.
4. Clip icon: Click on the image to start downloading, then playback the preview as soon as it
becomes available.
5. Clip link: Click on the link to simply download the clip without playing it back.
6. Clip Check Box: Enable the check box to either delete the clip, or set is as the main one.
7. Set as Main: This sets the selected clip as the default clip to be used in the scene page.
8. Delete: This will permanently delete the selected clips.
Note: While the clips can be loaded manually, it is also possible for the *.mov to be rendered
automatically from your third-party software to the folder. Here they will be seen by Manager,
as long as the directory structure matches that of the preview clip configuration plus:
project/jobs/scene/clips.mov
Toon Boom Manager User Guide
41
Scene Page
Scene Note
2
3
1
4
7
5
6
1. To: When sending the note as an e-mail, this is where you enter the e-mail of the person you
want to address your note to. This field is only enabled when the Send As Email option is
checked.
2. Alert Assigned User: Enable this option to send a copy of the note as a message to be read
on the assigned user’s Home page, and as an e-mail to the address stored in that user’s
profile.
3. Send As Email: Enable this option to e-mail the note to people other than the assigned user.
In the To field, type the complete e-mail addresses separated by spaces.
4. Text Box: Type the actual Note (Comment or Issue).
5. Comment / Issue: In this drop-down menu, select whether the note is a Comment or an Issue.
6. Type of Issue: When the note is set as an issue in this drop-down menu, you can select the
Issue type.
Read more: Key Concept: Issues, on page 89
7. Add: Click on this button to add the note entry into the system, as well as the sending of the
selected notifications.
Toon Boom Manager User Guide
42
What Do You Want To Do?
Create / Add
What Do You Want To Do?
Edit / Configure
• Creating a New Project, on page 46
• Configuring a Project, on page 51
• Adding a Job, on page 69
• Editing Preferences, on page 78
• Adding Scenes, on page 71
• Configuring Integrated Software, on page 48
• Creating a New User, on page 44
• Adding Team Members to a Project, on page 53
View / Find / Print
• Adding Acts, on page 76
• Search Scenes, on page 27
• Adding Stages to a Project, on page 55
• Printing Reports, on page 79
• Adding Conditions to a Project, on page 60
• Find Issues and Comments, on page 32
• Adding Issues to a Project, on page 64
• Scene Notes, on page 34
• Adding Global Stages, on page 66
• Adding Global Conditions, on page 67
• Adding Global Issues, on page 68
Import / Export
• Importing Scenes, on page 74
Toon Boom Manager User Guide
Delete / Remove
• Removing a User From a Project, on page 80
• Deleting a Project, on page 84
• Deleting a Job, on page 83
• Deleting a Scene, on page 82
Upload / Download
• Upload Scene Clips, on page 40
43
Creating a New User
Creating a New User
Before a user can be associated with a specific project, it must first be created at the global level.
To create a new user:
1. In the top area, go to the Admin menu
1
2
2. In the Administration section, go to Maintain Users.
3. If the user is not already in the User List, go to the Admin - User List section and click on the
Add User button to access the User Maintenance page.
3
Toon Boom Manager User Guide
44
Creating a New User
4
4. In the Admin - User Maintenance section,
fill all the required fields denoted by the (*)
asterisk symbol .
5
• Pay close attention to the Sys Admin
status, as a “yes” will trump any other
permission settings.
5. Click on the Save button to confirm.
•
Note that in the Profile page, the
user will be able to change all these details
,except for the Sys Admin and Active Status.
For this new user to have access to the
different projects, he/she will need to be
manually added to the Team Members of
said project.
Toon Boom Manager User Guide
45
Creating a New Project
Creating a New Project
To create a new project:
1. In the Navigation toolbar, click on the Admin button.
1
2
2. In the Admin - Main Menu, go to the Maintain Projects section.
3. In the Admin - Project List section, click on the Add Project button.
3
Toon Boom Manager User Guide
46
Creating a New Project
4. In the Admin - Project Maintenance section, enter the required information.
4
5
• The only required field is the Title.
• The description will appear whenever selecting the project, as will the Deadline and the
Project Manager.
• The Active Status will determine if the project is currently on-going and to be displayed.
This is typically set to Inactive only when retiring a project.
5. Click on the Save button to confirm the operation.
The Integrate with drop down allows you to connect this Project with a specific software
supporting such integration, such as Toon Boom Harmony 7.8 or 9.2. To use this feature, you
must configure Integrated Software. You can then come back to Project Maintenance afterwards.
As a next step, you may want to Configure your new Project.
Toon Boom Manager User Guide
47
Configuring Integrated Software
Configuring Integrated Software
The software integration allows jobs and scenes that are created or imported in Toon Boom Manager
to be automatically created in another software. For the time being, Toon Boom Harmony 7.8 and
Toon Boom Harmony 9.2 are supported.
This process is divided into two steps:
• Step 1: Configuring the Integrated Software, on page 48
• Step 2: Configuring Manager, on page 49
Step 1: Configuring the Integrated Software
To configure the integrated software:
1. Find the location of the Toon Boom Harmony Control Center on the Harmony server.
For example:
• /usr/local/ToonBoomAnimation/harmony_7.8/lnx86/bin
2. From there, run the following command line:
• Controlcenter -script -user usabatch -tcpPort 7890
With this, Harmony is listening on port 7890 for commands from Manager. You should configure
the Harmony server to initiate this service automatically.
Toon Boom Manager User Guide
48
Configuring Integrated Software
Step 2: Configuring Manager
To configure Manager:
1. In the Menu toolbar, click on the Admin button.
1
2
2. In the Admin menu, select Maintain Integrated Software.
3. In the Admin – Integrated Software List, click on the Add button.
3
Toon Boom Manager User Guide
49
Configuring Integrated Software
4. Enter a name for the software that Manager will contact.
4
5
6
7
8
5. Enter the IP address where this software resides, such as the address of a Toon Boom Harmony
server.
6. Enter the Host port. It must be the same one that was used with the Harmony software in
Step 1: Configuring the Integrated Software. In this example, we have used port 7890.
7. Enter the Host Filesystem. This is the location of where you want the actual scenes to be
created by the integrated software. The USADATA directory used in the above example is a
common Harmony file system.
8. Click on the Save button and proceed to integrate this software with specific projects.
Toon Boom Manager User Guide
50
Configuring a Project
Configuring a Project
To configure a project:
1. From the Home page, select the project you want to configure.
1
If there are no projects, see Creating a New Project, on page 46.
2. From the Project page, in the Menu toolbar, select Edit. This will take you to the Project
Maintenance page.
Toon Boom Manager User Guide
51
Configuring a Project
3. Four critical aspects of a project are edited from the Project Maintenance page:
• Team Members
• Stages
• Conditions
• Issues
In addition, you may modify the title and the description of the project.
This is also where you can upload a picture (*.jpg) that will represent the project. This image
will be used as a thumbnail for any Movie Preview Clip that does not have its own thumbnail.
Toon Boom Manager User Guide
52
Adding Team Members to a Project
Adding Team Members to a Project
To add a team member to a project:
1. From the Home page, select the project you want to add members to.
1
If there are no projects, see Creating a New Project, on page 46.
2. From the Project page, in the Menu toolbar, select Edit. This will take you to the Project
Maintenance page.
3. From the Project Maintenance page, select Team Members.
3
Toon Boom Manager User Guide
53
Adding Team Members to a Project
4
6
7
8
5
4. In the Project – Maintenance – Team page, from the New User drop-down menu, select the
user to add.
5.
6.
7.
8.
See Creating a New User, on page 44 if the user you want to add is not available.
Review the User Privilege Details prior to selecting the Role of this user within this project.
Select the User Role.
Set the user as active.
Click on the Add button to confirm to operation.
Toon Boom Manager User Guide
54
Adding Stages to a Project
Adding Stages to a Project
To add stages to a project:
1. From the Home page, select the project you want to add stages to.
1
If there are no projects, see Creating a New Project, on page 46.
2. From the Project page, in the Menu toolbar, select Edit. This will take you to the Project
Maintenance page.
3. From the Project Maintenance page, select Stages.
3
Toon Boom Manager User Guide
55
Adding Stages to a Project
5
4
4. In the Project – Maintenance – Stages page, from the New Stage drop-down menu, select
the stage to add.
See Adding Global Stages, on page 66 if the stage you want to add is not available in
the menu.
Do NOT Check the Automatically Distribute Weight option unless you want the estimated time
consumption factor of every stage to be the same and ignore the user defined weight. This is
only recommended if you do not know the actual relative time of each stage.
Read more: Key Concept: Weight, on page 95.
It is NOT recommended that you check the Recalculate All Estimated Dates for this Project
option, as it is best to wait until after the Average Duration has been entered for each stage,
and then use the Update Estimated Dates button.
5. Click on the Add button to confirm the operation.
6. Repeat the previous steps to add projects to any stage of the pipeline.
Toon Boom Manager User Guide
56
Adding Stages to a Project
Now is a good opportunity to edit the new Stages by clicking directly on them, allowing you to
adjust the Order, the Colour, the Active Status, the Weight and the Average Duration.
Toon Boom Manager User Guide
57
Editing the Stages for a Project
Editing the Stages for a Project
To edit the stages for a project:
1. From the Home page, select the project you want to edit the stages for.
1
If there are no stages, see Adding Stages to a Project, on page 55.
2. From the Project page, in the Menu toolbar, select Edit. This will take you to the Project
Maintenance page.
3. From the Project Maintenance page, select Stages.
3
Toon Boom Manager User Guide
58
Editing the Stages for a Project
4. Click on the stages you want to edit.
5. The value of Order will determine the chronological position of this stage within the pipeline
of the current project.
5
6
7
8
9
10
6. The Colour will be used to display scenes at that stage.
7. The Average Duration represents the average number of days it will take for all the scenes
of a group (episode, act, etc.) to complete this stage. This is used to automate the Update
Estimated Dates.
8. A stage should be set as Active, unless you temporarily do not want to use it.
9. The weight is the relative time it takes to complete this stage as compared to the others. You
can either enter it in percentage or in minutes, as long as you remain consistent. This will be
converted into percentages.
10.Click on the Save button to confirm the operation.
Toon Boom Manager User Guide
59
Adding Conditions to a Project
Adding Conditions to a Project
To add conditions to a project:
1. From the Home page, select the project you want to add conditions to.
1
2. From the Project page, in the Menu toolbar, select Edit. This will take you to the Project
Maintenance page.
3. Click on the Conditions link.
3
Toon Boom Manager User Guide
60
Adding Conditions to a Project
5
4
6
4. From the Project – Maintenance – Conditions page, from the New Condition drop-down
menu, select the condition to add.
See Adding Global Conditions, on page 67 if the condition you want to add is not
available.
5. Click on the Add button to confirm your choice.
6. Now is a good time to edit the new conditions by clicking directly on them.
Toon Boom Manager User Guide
61
Editing Conditions for a Project
Editing Conditions for a Project
To edit conditions for a project:
1. From the Home page, select the project you want to edit conditions for.
1
2. From the Project page, in the Menu toolbar, select Edit. This will take you to the Project
Maintenance page.
3. Click on the Conditions link.
3
4. From the Project – Maintenance – Conditions page, click on the conditions you want to edit.
Toon Boom Manager User Guide
62
Editing Conditions for a Project
5
6
7
8
9
5. The value of Order will determine the position of this condition within the list of conditions
for the current project.
6. The Colour will be used to display scenes having this particular condition UNLESS the
Exception option is set to No.
7. A condition should be set to Active unless you temporarily want to disable it.
8. Click on the Save button.
9. This page can also be used to delete a condition from a project.
It is recommended to have a condition set to normal (as a non-exception) for all projects.
Toon Boom Manager User Guide
63
Adding Issues to a Project
Adding Issues to a Project
To add issues to a project:
1. From the Home page, select the project you want to add an issue to.
1
2. From the Project page, in the top right-hand bar, select Edit. This will take you to the Project
Maintenance page.
3. From the Project Maintenance page, select Issues.
3
Toon Boom Manager User Guide
64
Adding Issues to a Project
5
4
6
4. From the Project – Maintenance – Issues page, from the New Issue drop-down menu, select
the issue to add.
See Adding Global Issues, on page 68 if the issue you want to add is not in available
in the menu.
5. Click on the Add button.
6. You may access a page to edit or delete any issue by clicking directly on them.
Toon Boom Manager User Guide
65
Adding Global Stages
Adding Global Stages
To add global stages:
1. In the Menu toolbar, click on the Admin button.
2. In the Admin page, select Maintain Stages.
2
The default stages list appears.
3. Click on the Add Stage button to add another stage that will then be available for all projects.
3
You can also click directly on a specific stage to edit the order, the colour, the active status or
even to delete the stage.
Toon Boom Manager User Guide
66
Adding Global Conditions
Adding Global Conditions
To add global conditions:
1. In the Menu toolbar, click on the Admin button.
2. In the Admin page, select Maintain Conditions.
2
The default list of conditions appears.
3. Click on Add Condition to add another condition that will then be available for all projects.
3
You can also click directly on a specific condition to edit the order, the colour, the active status
or even to delete the specific condition.
Toon Boom Manager User Guide
67
Adding Global Issues
Adding Global Issues
To add global conditions:
1. In the Menu toolbar, click on the Admin button.
2. In the Admin page, select Maintain Issues.
2
The default list of issues appears.
3. Click on Add Issues to add another issue that will then be available for all projects.
3
You can also click directly on a specific issue to edit the order, the colour, the active status or
even to delete the specific issue.
Toon Boom Manager User Guide
68
Adding a Job
Adding a Job
To add a job:
1. From the Home page, select the project in which you want to add a job.
1
If there are no projects, see Creating a New Project, on page 46.
2. From the Project page, click on Add Job.
2
Toon Boom Manager User Guide
69
Adding a Job
3
4
5
6
7
3. In the Title field, enter the name for the job.
4. Set the Job Number. It will determine the position in which the job will appear. It has to be a
numerical value.
5. Set the Job Code. It is a diminutive name for the job, for example: Ep03.
All of the above three steps are mandatory, as denoted by the asterisk.
6. It is a good idea to enter the beginning and end dates for the job, however this will not be
used to determine the estimated dates per stage.
7. Click on the Save button to confirm the operation.
Toon Boom Manager User Guide
70
Adding Scenes
Adding Scenes
To add a scene:
1. From the Home page, select the project and the job in which you want to add scenes.
1
2
2. In the Menu toolbar, click on Edit.
Adding scenes to a job can be done in 3 ways:
• Appending Scenes, on page 72
• Inserting Scene, on page 73
• Importing Scenes, on page 74
All of which are accessible from the same location:
• Job – Maintenance page
Toon Boom Manager User Guide
71
Adding Scenes
Appending Scenes
To append scenes:
1. From the Home page, select the project and the job to which you want to add scenes.
1
2
2. In the Menu toolbar, click on Edit.
3. From the Project – Job – Maintenance page, click on Append Scenes.
4
5
6
7
4. Enter the Number of scenes to append.
5. Set what Stage you want the scenes to be created.
6. You have the option to give the scenes a particular condition from the start, however the
default Normal is likely what you will require most of the time.
7. Click on Append to create all these scenes.
New scenes will be created as 001-002-003… unless there are already scenes in exitence,
in which case they will numerically follow the highest numbered scene.
Toon Boom Manager User Guide
72
Adding Scenes
Inserting Scene
To insert scenes:
1. From the Home page, select the project and the job to which you want to add scenes.
1
2
2. In the Menu toolbar, click on Edit.
3. From the Project – Job – Maintenance page, click on Insert Scene.
4. Type a Name for the scene to be inserted, for example: 022a.
4
5
6
7
8
9
5.
6.
7.
8.
9.
In Scene order, give the name of the scene after which you want the new scene to be added.
Select a stage for the new scenes.
Set a condition for the new scenes.
Optionally set a start date.
Click Insert to confirm.
Toon Boom Manager User Guide
73
Adding Scenes
Importing Scenes
Importing scenes in Manager refers to the process of creating a group of scenes as listed in a *.csv file
(comma separated values). This file may have been exported from Toon Boom Storyboard Pro,or
have been created directly in a spreadsheet program such as Microsoft Excel or OpenOffice Calc.
Manager will create the scenes with the names that are listed in the file and will import other data,
such as Caption (as exported by Toon Boom Storyboard Pro) or Scene Duration.
Scenes imported in the above fashion can be automatically created in Toon Boom Harmony,
provided that you have configured the integrated software.
Note that other data such as QuickTime clips are not imported by this procedure and that linking
QuickTime clips with Manager scenes is another process altogether.
The *.csv file should look like this:
• The header of the first column must be ObjectId, but the column itself does not have to
contain anything.
• SceneName has to contain the name of the scenes.
• SceneFrames has to contain the duration of the scene in frames.
• Anything with the header Note will be imported as a note.
• Anything with the header Issue will be imported as an issue.
The importing user will have the opportunity to import or dismiss the content of any other columns
as notes, for which the column header will become the caption.
Toon Boom Manager User Guide
74
Adding Scenes
To import scenes:
1. From the Home page, select the project and the job to which you want to import scenes.
1
2
2. In the Menu toolbar, click on Edit.
3. From the Project – Job – Maintenance page, click on Import Scenes from Storyboard.
4. Choose File to browse to your *.csv file.
4
5
5. Click Import CSV.
Toon Boom Manager User Guide
75
Adding Acts
Adding Acts
Acts are a useful way to divide a job. They can represent different segments of the story, or
different “reels”. If you require a visual feedback, or need to view the different parts of your job
and be able to filter scenes accordingly, acts are the way to go.
To add acts:
1. From the Home page, select the project and the job in which you want to add acts.
1
2
2. In the Menu toolbar, click on Edit.
Toon Boom Manager User Guide
76
Adding Acts
3
4
5
6
7
8
3.
4.
5.
6.
7.
8.
In the Job – Maintenance page, enter the act name.
Select the colour that will be displayed above the scenes of that act in the Scenes area.
Set where the act begins .
Set where the act ends.
Click on the Add button.
Just below, the Update Act section will become available to allow you to edit existing acts.
Toon Boom Manager User Guide
77
Editing Preferences
Editing Preferences
The preferences that can be edited per users are available through the Profile section, from the
Menu toolbar.
• You can set whether the Legend and the Job Overview from the Job page are collapsed
or expanded.
• You can set how many columns of scenes are to be displayed in the Scene area.
• You can also set many other useful user interface preferences.
Toon Boom Manager User Guide
78
Printing Reports
Printing Reports
To print reports:
1. From anywhere within a project, in the Menu toolbar, click on the Report button to choose
to display:
• Project Overview
• Detailed Job Overview
• Summary of each Users Privileges for any given project
Toon Boom Manager User Guide
79
Removing a User From a Project
Removing a User From a Project
To remove a user from a project:
1. From the Home page, select the project you want to remove members from.
1
2. From the Project page, in the Menu toolbar, select Edit. This will take you to the Project
Maintenance page.
3. From the Project Maintenance page, select Team Members.
3
Toon Boom Manager User Guide
80
Removing a User From a Project
4
6
5
4. From the Project – Maintenance – Team page, select the user to be added or removed.
5. Change the user status to inactive.
6. Click on the Update button.
Toon Boom Manager User Guide
81
Deleting a Scene
Deleting a Scene
To delete a scene:
1. In the Navigation toolbar, select the project and the job containing the scene you want to
delete.
1
2. In the Project - Job section, under the Scenes area, click on the scene’s name to display its
page.
button.
3. From the Scene page, click on the Delete
Note that you can also delete multiple scenes from the Job page.
Toon Boom Manager User Guide
82
Deleting a Job
Deleting a Job
To delete a job:
1. In the Navigation toolbar, select the project containing the job you want to delete, as well as
the job to delete.
2. In the Menu toolbar, click on the Edit button.
1
3. From the Job – Maintenance page, click on the Delete
A window will pop-up to confirm the operation.
Toon Boom Manager User Guide
2
button.
83
Deleting a Project
Deleting a Project
To delete a project:
1. In the Menu toolbar, click on the Admin button.
2. In the Admin page, click on Maintain Projects.
2
3. Select the project to delete and either hide it by making it inactive, or use the Delete button
to delete it.
Toon Boom Manager User Guide
84
Key Concept: Active/Inactive
Deleting a Project
The concept of active versus inactive applies to projects, jobs, scenes and even to users.
By default everything is active. This means that you can view and edit the active entities.
Rendering an entity inactive is a way to hide it from view, without actually deleting the
data.
In the case of users, an active status means that they can go about their business according
to their privileges for a given project. Making a user inactive will suspend their right to
log into Manager. This is an interesting option if you are required to temporarily remove
a user that may have to return in the future.
Toon Boom Manager User Guide
85
Key Concept: Approval Status
Deleting a Project
Also known as the Current Stage Status, the Approval Status is a way to keep track of
how a scene is progressing through its current stage.
There are four Approval Status:
1.
2.
3.
4.
Pending (blue)
In Progress (yellow)
For Approval (red)
Approved (green)
Approval Status can be changed back and forth, however changing the actual stage of
a scene will reset the Approval Status back to Pending.
Toon Boom Manager User Guide
86
Key Concept: Comments
Deleting a Project
Comments are texts that can be added to any scenes. Many comments can be logged
per scenes and it is possible to assign the same comment to multiple scenes. Contrary to
an issue, a comment does NOT have to be resolved. However, a scene can be marked/
unmarked with a “comment icon” (with a notepad and pencil, as depicted below).
Typically, comments are used to pass on general information about the scene without
the implication that something has to be fixed.
A comment can be passed on a scene by anyone that has the “add notes/comments/
captions” right for a given project.
Toon Boom Manager User Guide
87
Key Concept: Conditions
Deleting a Project
A condition applies to a scene. Unlike scene stages, scene conditions are not typically
linear. They are used to express a particular state about a scene, notwithstanding its
current stage in the pipeline.
One important option about a condition within a project is whether it is an exception.
Those conditions set to be exceptions will override the colour of the scene, whereas
non-exception conditions will not affect the appearance of scenes.
Several conditions are preset at the global level however one can add as many new
different conditions as required. Conditions must then be configured for specific project.
On recent versions of Manager, one may set many conditions per scene. However, setting
a scene to the default condition Normal will remove any other conditions that may have
been set.
Toon Boom Manager User Guide
88
Key Concept: Issues
Deleting a Project
An issue is a situation that has to be resolved. It can either be an ongoing issue, in which
case it is said to be open, or it can be a resolved issue, in which case it is labeled as
closed.
Scenes can have many issues. The more specific issues are available within a project, the
easier it becomes to track issues by type, to recognize trends and identify areas of the
production that require more attention.
A scene may be tagged with an issue by anyone that has the “add notes/comments/
captions” right for a given project.
Issues should first exist at the global level prior to be added to a specific project.
Toon Boom Manager User Guide
89
Deleting a Project
Key Concept: Job
Scene 001
Job A1
Scene 002
Project A
Scene 001
Job A2
Scene 002
A job is part of a project and contains a set of scenes. It shares the same workflow as
other jobs within the same project.
This unit of data structure usually represents what is known in TV as an episode or as a
sequence in Feature Film or in Gaming.
It may itself be divided into Acts or Reels.
Toon Boom Manager User Guide
90
Deleting a Project
Key Concept: Project
Scene 001
Job A1
Scene 002
Project A
Scene 001
Job A2
Scene 002
A project is the biggest data structure in Manager. It will usually be made up of several
jobs, which in turn will be divided in many scenes.
A project has its own pipeline and therefore is configured with its own set of stages,
conditions and issues.
Projects are added by an admin user.
Toon Boom Manager User Guide
91
Deleting a Project
Key Concept: Scene
Scene 001
Job A1
Scene 002
Project A
Scene 001
Job A2
Scene 002
A scene is the basic building block of the data structure in Manager. It makes up the bulk
of the data. Scenes are contained within a job.
A scene can be assigned to a user. It always has a current stage. It contains much
information, such as duration, notes, issues, conditions. It can contain links to Preview
clips.
Toon Boom Manager User Guide
92
Key Concept: Stages
Deleting a Project
Stages are the linear steps through which every scene must go. They are the foundation
of the Manager pipeline. The current stage of a scene will determine its colour and is
arguably the most important information Manager is tracking.
Several Global stages are preset however one can add as many new different stages as
required. Stages must then be configured for specific projects.
Toon Boom Manager User Guide
93
Key Concept: Stage Dates
Deleting a Project
Estimated Stages Dates allow you to plan when a group of scenes is supposed to go
through each stage in the pipeline.
While these can be entered per scene and per stage, it is more convenient to set the
planning for a whole episode. This can be done by using the Estimated Start Date box
from the Expanded Update area to change all the estimated dates for the all the stages
based on the Average duration of each stage (as set in the Stage Configuration of the
Project).
The Actual Stage Dates are useful to log discrepancies between the planning and reality.
The best representation of all this planning information is available by clicking the View
Estimated Stage Dates link in the scene page. It is a scrollable timeline with the current
stage in black, the “on time” stages in green, the stages “in danger of being late” in
yellow and the stages already late shown in red.
Toon Boom Manager User Guide
94
Key Concept: Weight
Deleting a Project
The concept of weight applies to stages. Within a given project, every stage is more
or less heavy. That is, this is the estimated time consumption factor for that stage to
completed. The weight only makes sense in relation to the weight of other stages.
For example, if one chooses to express the weight in minutes, the weight of the stages
Layout and Animation could then be set be 100 and 300, respectively. That would mean
that if there are no other stages, the Layout stage is believed to account for 25% of the
total time available for this scene, while Animation represents 75%.
The weight will be used to express how far along any given part of a project is. For
example, a project may have most of its stages completed, but still be less than 50%
done, if the completed stages were “light” ones.
Toon Boom Manager User Guide
95
Index
Index
Global Issue 68
A
Act 28, 76, 90
Adding 76
Colour 77
Admin Page 12
Importing Scenes 74
Data Structure 14
Inserting Scene 73
Home Page 9
Job 69
Job 90
Project 46
Job Page 19
Scene 71
Map of Manager 8
User 44
Overview 5
Admin Page 12, 46, 66
Update 77
Access 12
Active
Chart
Global Stage 66
Creating a New User 44
Project 91
Project Page 15
Scene 92
Scene Page 35
Condition 63
Description 13
Global Condition 67
Maintain Colours 13
Global Issue 68
Maintain Conditions 13, 67
Check Box 41
Key Concept 85
Maintain Integrated Software 13, 49
Delete 41
Show / Hide Inactive Scenes 23
Maintain Issues 13, 68
Icon 41
Show Inactive Jobs 17
Maintain Projects 13, 84
Image 41
Stage 59
Maintain Stages 13, 66
Interface 40, 41
Status 45, 47, 57
Maintain Users 13
Link 41
User 54
System 13
mov 41
Activity Log 38
Approval
Approved 86
Actual
In Progress 86
Relative Time 56
Key Concept 86
Stage Dates 31, 39, 94
Pending 86
Update Actual Stage Dates 31
Add
Act 76
Adding Issues to a Project 64
Adding Stages to a Project 55
Appending Scenes 72
Status 25, 28, 30
Clip 40
Playback 40, 41
Preview 52, 92
QuickTime 40, 74
Set as Main 41
Upload 41
Colour 57, 59
Act 77
C
Approval Status 86
Caption 74
32
Condition 63, 67
Global Condition 67
Global Stage 66
Conditions to a Project 60
Issue 68
Global Condition 67
Job Page 19
Toon Boom Manager User Guide
96
Index
Legend 21, 33
Configuration
Data Structure 14
Maintain 13
Conditions 88
Job 90
Stage 59, 93, 94
Harmony File System 50
Project 91
Harmony Server 48
Scene 92
Comment 32
Host Filesystem 50
Comments/Captions 32
Host Port 50
Job Page 21
Integrated Software 48, 74
Key Concept 87
IP address 50
Mark Comment 39
Manager 49
Scene Note 34, 42
Project 51
Communication
Stage 94
Alert Assigned User 42
Bulletins 11
Comments Key Concept 87
Toon Boom Harmony Server 50
Contact
Project 17
Scene Note 34, 42
User Messages 11
Condition 28, 30, 52, 60
Control Center 48
Create
Date
Actual End Date 29
Actual Stage Date 31, 39, 94
Actual Start Date 29
End Date 31
Estimated End Date 29
Estimated Stage Dates 39
Estimated Start Date 29, 31, 94
Job Start / End Date 23
Recalculate All Estimated Dates 56
Stage Dates Key Concept 94
Start Date 31, 73
Update Actual Stage Dates 31
Active 63
Act 76
Update Estimated Dates 56, 59
Active Status 67
Appending Scenes 72
Update Estimated Stage Dates 31
Adding Conditions to a Project 60
Global Conditions 67
View Estimated Stage Dates 39
Adding Global Conditions 67
Global Issues 68
Colour 63, 67
Global Stages 66
Conditions Page 61, 62
Inserting Scene 73
Current 39
Job 69
Delete 63, 67
Project 46
Edit 62
Scene 71
Exception 63
User 44
Key Concept 88
List 67
Maintain Conditions 13, 67
Non-exception 63
Condition 63
Global Condition 67
Global Issue 68
Issue 65
Job 83
Project 84
Removing a User From a Project 80
D
Scene 30, 39, 82
Data 74
Order 63, 67
Scene 92
Scene 73, 92
Structure 14, 90
Toon Boom Manager User Guide
Delete
Stage 66
Download
Clip 41
97
Index
Duration
Global
Stage Average Duration 56, 59
Scene 74, 92
Update Estimated Dates 56, 59
Condition 67
Stage Average Duration 56, 57, 59
Update Estimated Stage Dates 31
Filter 17
View Estimated Stage Dates 39
Issue 68
Weight 59
Stage 66, 93
E
Weight Key Concept 95
Edit
Exception
Adding Conditions to a Project 60
Condition 63
Adding Issues to a Project 64
Condition 62
Configuring a Project 51
Menu Toolbar 58, 64, 73
Scene 35
Home Page 9
Feature Film
Scene Watch 11
User Messages 11
Approval Status 28
Host
Clear 28
End
End Date 31
Conditions 28
Host Filesystem 50
Estimated End Date 29
Host Port 50
Estimated Start Date 29
IP address 50
Expanded Filter 28, 29
Episode 90
Global Filter 17
Stage Date 94
Issue 28
Stage 28
Estimate
User 28
Automatically Distribute Weight 56
Toon Boom Manager User Guide
Projects 11
Actual Start Date 29
Send As Email 42
Recalculate All Estimated Dates 56
Job Watch 11
Actual End Date 29
Note 42
Estimated Start Date 29, 31, 94
Interface 10
Act 28
Alert Assigned User 42
Estimated Stages Dates 94
Description 11
Filter 21, 28, 76
e-mail
Estimated Stage Dates 39
Bulletins 11
Job 90
Stage 58
Estimated End Date 29
Activity Log 38
F
Preferences 78
Project Maintenance 22
History
Non-exception 63
Adding Stages to a Project 55
Adding Team Members to a Project 53
H
I
Image 41
jpg 41, 52
Movie Preview Clip 52
G
Thumbnail 52
Upload a Picture 52
Gaming
Job 90
98
Import
Caption 74
Columns 74
csv 74, 75
csv Sturcture 74
Data 74
Header 74
ObjectId 74
Issue 74
Note 74
Scene 74, 75
Storyboard 75
Toon Boom Storyboard Pro 74
Maintain Integrated Software 13
Key Concept 89
Toon Boom Harmony 48
List 68
Maintain Issues 13, 68
Interface
Open 32
Act 77
Order 68
Conditions Edit Page 63
Scene 92
Expanded Update 31
Scene Note 42
Filter 28
Scene Notes 34
Filter Interface 28
Type 42
Getting Around in Manager 7
Home Page 10
Issues Page 65
Job Page 20
Index
J
Job
Job Page - Scenes 24
Active/Inactive Key Concept 85
Legend and Job Overview 33
Add 69
Condition 63
Menu Toolbar 7
Current 37
Key Concept 85
Navigation Toolbar 7
Delete 83
Project 84
Preferences 78
Episode 90
Project Status 47
Project Page 16
Feature Film 90
Scene 25
Scene Clip - See All 41
Gaming 90
Show / Hide Inactive Scenes 23
Scene Page 36
Job Code 70
Show Inactive Jobs 17
Scene Status 38
Job Details 21, 23
Stage 59
Team Page 54, 81
Job Maintenance Page 70, 71, 73, 75, 77, 83
User 81
Update 30
Job Number 70
Inactive
Insert
Scene 73
Integrated Software 47, 74
Configuring 48
Configuring Manager 49
Harmony File System 50
Host Filesystem 50
Host Port 50
IP address 50
List 49
Toon Boom Manager User Guide
Issue 28, 32, 52, 64
Active Status 68
Add 68
Adding Issues to a Project 64
Closed 32
Colour 68
Comments/Captions 32
Delete 65, 68
Issues Page 65
Job Page 21
Job Overview 21, 33
Job Page 19
Job Watch 11
Key Concept 90
Note 21
Printable 23
Reel 90
Sequence 90
Start / End Date 23
Title 70
99
Index
Job Page 19
Access 19
L
Scene Note 42
User Messages 11
All Notes 32
Legend 21, 33
Description 21
Login 6, 85
Filter 21, 28
Access Page 6
Interface 20
Password 6
Issues and Comments 21, 32
System Administrator 6
Job Details 21, 23
Username 6
Job Overview 21, 33
Legend 21, 33
Notes 21
Scene Note 34
M
Maintain
Condition 13, 67
Scenes Interface 24
Integrated Software 13, 49
Search Scenes 21, 27
Issue 13, 68
Time 21
Job Maintenance Page 71, 73, 75, 77, 83
Update 21
Project 13, 46, 84
Project Maintenance Page 18, 51, 52, 53,
55, 58, 60, 62, 64, 80
Approval Status 86
Comments 87
Conditions 88
Issue 89
Job 90
Project 91
Scene 92
Stage 93
Scene Link 25
Toolbar 7
New
Act 76
Appending Scenes 72
Global Condition 67
Global Issue 68
Global Stage 66
Stage 13, 66
Inserting Scene 73
User 13, 44
Job 69
Menu
Navigation Toolbar 7
Report 18, 22
Toolbar 7
Project 46
Scene 71
User 44
Note 21, 32
Edit 18, 51, 55, 58, 62, 64, 73
Alert Assigned User 42
Report 79
Closed Issues 32
Report and Maintenance Access 22
Comment/Issue 34, 42
Message
Stage Dates 94
Alert Assigned User 42
Weight 95
Bulletins 11
Comments Key Concept 87
Toon Boom Manager User Guide
Navigation
Scene 37
Scenes Description 25
Active/Inactive 85
N
Data Structure 14
Colour 13
Key Concept
Microsoft Excel 74
A Map of Manager 8
Scenes 21
K
Microsoft
Comments/Captions 32
e-mail 42
Job Page 32
Open Issues 32
Scene 34, 42, 92
100
Send As Email 42
Type of Issue 42
Playback 40
Clip 41
Preferences
O
Edit 78
OpenOffice
OpenOffice Calc 74
Order
Condition 63, 67
Global Stage 66
Issue 68
Scene 73
Legend and Job Overview 33, 78
Results per page 25
Scene area 78
Preview
Clip 92
Print
Detailed Job Overview 79
Printable 23
P
Project Overview 79
Page
Admin 12, 44, 46, 49
Conditions 61, 62
Report 79
Users Privileges 79
Profile 78
Adding Conditions 60
Index
Adding Issues 64
Adding Stages 55
Adding Team Members 53
Conditions 52
Configuring 51
Configuring Integrated Software 48
Contacts 17
Create 46
Current 37
Deadline 47
Delete 84
Editing Conditions 62
Editing the Stages 58
Inactive 84
Issue 52
Key Concept 91
Maintain Projects 13, 84
Home 9
Editing Preferences 78
Movie Preview Clip 52
Issues 65
Legend and Job Overview 33, 78
Percent Completed 17
Job 19
Profile Page 45
Project Details 17
Job Maintenance 70, 71, 73, 75, 77, 83
Results per page 25
Profile 45
Scene area 78
Project Maintenance Page 18, 22, 51, 52,
53, 55, 58, 60, 62, 64, 80
Project 15
Project Maintenance 52, 53, 55, 58, 60, 62,
64, 80
Progress
Project Manager 47
Project Page 15
Approval Status Key Concept 86
Removing a User 80
Scene 35
For Approval 86
Report 18, 22
Stages 56
In Progress 86
Stage 52, 55
Team 54, 81
Job Overview 21, 33
Status 47
Pending 86
Thumbnail 52
Percentage Completed 17, 37
Title 47
Weight 17, 23, 57
User Role 54
Password 6
Changing the Admin Password 6
Pipeline
Project 91
Stage 93
Toon Boom Manager User Guide
Project 46
Active/Inactive Key Concept 85
101
Index
Project Manager 47
Project Page
Access 15
Description 17
Global Filter 17
Interface 16
Percent Completed 17
Project Contacts 17
Project Details 17
Show Inactive 17
Weighted Progress 17
Q
QuickTime 40, 74
mov 41
Scene Clips 40
R
Reel
Job 90
Remove
User From a Project 80
Report 18, 22
S
Key Concept 92
Link 25
Scene
Mark Comment 39
Active/Inactive Key Concept 85
Next 37
Activity Log 35, 38
Note 32, 34, 42, 92
Actual Stage Dates 39
Order 73
Add 71
Percentage Completed 37
Appending Scenes 72
Previous 37
Approval Status 25, 30
Refresh Thumbnails 25
Approval Status Key Concept 86
Save 39
Assigned User 39
Scene Page 35
Checkbox 25
Scene Watch 11
Clip 40, 92
Search 21, 27
Clip Icon 41
Stage 30, 31
Clip Playback 40
Start Date 31
Comments Key Concept 87
Status 38
Condition 30, 92
Thumbnail Size 25
Conditions Key Concept 88
Update 21, 30
Current 37
Update Actual Stage Dates 31
Current Condition 39
Update Estimated Stage Dates 31
Current Stage 38
Update Many Scenes 30
Delete 30, 39, 82
Upload Clip 41
Duration 39, 74, 92
User 30
End Date 31
Estimated Stage Dates 39
Estimated Start Date 31
Detailed Job Overview 79
Expanded Update 31
Printing 79
Import 74
Project 18
Insert 73
Project Overview 79
Issue 92
Users Privileges 79
Issues Key Concept 89
Job Maintenance Page 71
Scene Page 35
Access 35
Activity Log 38
Clip 40
Current Stage 38
Interface 36
Navigation 37
Status 38
Job Page 21
Job Page - Scenes Description 25
Toon Boom Manager User Guide
102
Search 27
Approval Status Key Concept 86
In Progress 86
Act 28
Approved 86
Job Overview 33
Actual End Date 29
Average Duration 56, 57, 59, 94
Pending 86
Actual Start Date 29
Colour 66, 94
Sys Admin 45
Approval Status 28
Current 38
Closed Issues 32
Delete 66
Conditions 28
Edit 58
Estimated End Date 29
Estimated Stage Dates 39
Estimated Start Date 29
For Approval 86
Filter 21, 28
Global 93
Expanded Filter 28, 29
Legend 21, 33
Note 32
List 66
Open Issues 32
Maintain Stages 13, 66
Results per page 25
Order 57, 59, 66
Scene 21, 27
Scene 73
Scene Range 27
Stages Page 56
Stage 28
Status 39, 86
User 28
View Estimated Stage Dates 39
Sequence
Job 90
Software
Integrated Software 47, 48, 74
Microsoft Excel 74
Weight 59, 95
Start
Estimated Start Date 31, 94
Start Date 31, 73
Status 38
OpenOffice Calc 74
Active 45, 57
Toon Boom Harmony 5, 47, 48, 74
Approval 25, 28, 30
Toon Boom Manager 5, 48
Approval Status Key Concept 86
Toon Boom Storyboard Pro 5, 74
Approved 86
Stage 30, 31, 52, 55, 58
Active 59
Active Status 66
Actual Stage Dates 31, 39, 94
Adding Global Stages 66
Toon Boom Manager User Guide
System Administrator 6
Adding Project 91
Add notes/comments/captions right 89
Admin Page 12
Changing the Admin Password 6
Creating a New User 44
Key Concept 93
Issue 28
Current Stage 39, 86
For Approval 86
Global Condition 67
Global Issue 68
Global Stage 66
Index
Login 6
Password 6
Username 6
T
Team
Adding Team Members to a Project 53
Team Members 45, 52, 80
Team Page 54, 81
User Privilege Details 54
Thumbnail 52
Image 41
Refresh 25
Size 25
Time 21
Current Time 26
Last Update 26
Toolbar
Menu Toolbar 7
Edit 55, 58, 64, 73
Report 79
Navigation Toolbar 7
103
Index
Toon Boom
Upload
Harmony 5, 47, 48, 74
Upload 41
Picture 52
Harmony Server 48, 50
User 28, 30, 44
Manager 5, 48
Active 54
Storyboard Pro 5, 74
Toon Boom Harmony
48, 50, 74
See All 40
Active/Inactive Key Concept 85
5, 47,
W
Weight 57, 59, 95
Active Status 45, 47
Automatically Distribute Weight 56
Adding Team Members to a Project 53
Key Concept 95
Control Center 48
Add notes/comments/captions right 89
Weighted Progress 17, 23
File System 50
Alert Assigned User 42
Server 48, 50
Assigned User 39
Create 44
Toon Boom Manager 5, 48
Editing Preferences 78
Configuration 49
Legend and Job Overview 33
Toon Boom Storyboard Pro 5,
74
Maintain Users 13
Workflow
Job 90
Manager Pipeline 93
Project 91
Scene 92
Maintenance 45
Message 11
U
Privilege Details 54
Project Maintenance Page 53
Update 21, 30
Removing a User From a Project 80
Act 77
Role 54
Actual Stage Dates 31
Sys Admin Status 45
Clip Check Box 41
Team Members 45, 52, 80
Estimated Dates 56, 59
Team Page 81
Estimated Stage Dates 31
Estimated Start Date 31
Expanded Update 30, 31, 94
Last Update 26
V
Video
Save Project 47
Clip Playback 40
Save Scene 39
Delete 41
Scene Checkbox 25
mov 41
Stage 31
Playback 41
Update Many Scenes 30
QuickTime 40, 74
Scene Clips 40
Toon Boom Manager User Guide
104