Trolleybus Benchmarking Vehicles and infrastructure
Transcription
Trolleybus Benchmarking Vehicles and infrastructure
Trolleybus Benchmarking Vehicles and infrastructure Information to UITP Trolleybus-WG Report of results 14 th Solingen, December, 2006 Content Content Initial situation and goals Methodology Example for results Conclusion and summary Further proceeding Trolleybus Benchmarking Vehicles and Infrastructure Report of results 14 December, 2006 Trolleybusbenchmarking_Final_v4.ppt © S2R Consulting 2006 Seite 2 Typically operations is analysed well, vehicles and infrastructure have a lack of information Trolleybus-systems differ substantially from diesel-bus particularly in technical matters with corresponding consequences on running cost and investment Initial situation and goals Therefore, several trolleybus operating companies initiated this benchmarking-project in order to understand differences in performance between each other and to look for improvements The work focuses on vehicles and infrastructure, because there is obviously the biggest lack of information Processes, performance and services should be analysed in depth and related by the corresponding efforts occurring in the individual operating companies Of course, individual situation in terms of technical Trolleybus Benchmarking Vehicles and Infrastructure solutions and services provides is taken into account Report of results 14 December, 2006 Trolleybusbenchmarking_Final_v4.ppt © S2R Consulting 2006 Seite 3 Companies from 4 different countries united in the pilot project Initial situation and goals Mileage: Vehicles: Passengers: 0,7 m car-km 15 pcs 5,0 m Mileage : 2,9 m car-km Vehicles : 50 pcs Passengers : 16,3 m Mileage: 1,9 m car-km Vehicles : 36 pcs Passengers : 29,6 m Mileage: 4,3 m car-km Vehicles : 81 pcs Passengers : 36,0 m Mileage: 1,6 m car-km Vehicles : 37 pcs Passengers : 19,5 m Trolleybus Benchmarking Vehicles and Infrastructure Report of results 14 December, 2006 Trolleybusbenchmarking_Final_v4.ppt © S2R Consulting 2006 Seite 4 Comparability of the companies is assured with a proven methodology Results of previous analysis Driver costs 1 • Especially for the vehicles there is in nearly every company significant room for improvement Customer management 2 1 • Staff Productivity and instrumental support are often not competitive Staff analysis Staff analysis (related to to vehicles (related vehicles andand value chain levels value chain levels Kundenmanagement Kunde nmanage me nt • •Schedule. Schedule.Rotation Rotationand and Linienverkehr Inhalt der Funktion Personalkosten der Mitarbeiter die Fahrdienst geleistet haben Dienstkleidung/Material Linienverkehr Ausbildung Personalkosten der Mitarbeiter die Fahrdienst geleistet haben Sonstige Sozialleistungen Dienstkleidung/Material Sonderverkehre Ausbildung Personalkosten der Mitarbeiter die Fahrdienst geleistet haben Sons tige Sozialleistungen Dienstkleidung/Material Sonderverkehre Personalkosten der Mitarbeiter die Fahrdienst geleistet haben Ausbildung Dienstkleidung/Material Sonstige Sozialleistungen Ausbildung Sonstiges Sons tige Sozialleistungen Unternehmensleitung Sonstigesund Sozialwesen PersonalUnternehmensleitung Aus-und Weiterbildung Personal- und Sozialwesen Allgemeine Verwaltung Aus-und Weiterbildung Kaufmännische Verwaltung Allgemeine Verwaltung EDV-Kosten Kaufmännische Verwaltung Revision EDV-Kosten Organisation Revision Rechtswesen Organisation Liegenschaftsverwaltung Rechtswesen Versicherungswesen Liegenschaftsverwaltung Umweltschutz Versicherungswesen Arbeitssicherheit Umweltschutz Ärztlicher Dienst Arbeitssicherheit Einkauf Ärztlicher Dienst Kleiderkammer Einkauf Druckerei Kleiderkammer Kantine Druckerei Kommunikation Kantine Sonstiges Kommunikation Marketing Sonstiges& Vertrieb Werbung Marketing & Vertrieb Fahrgastinformation (inkl. DFI) Werbung Mobilitätsmanagement/Fahrgastservice Fahrgastinformation (inkl. DFI) Mobilitätsmanagement/Fahrgastservice Vertrieb Vertrieb Fahrkartenverkauf (alle Vetreibskanäle) Fahrkartenverkauf(nur (allefür Vetreibskanäle) Verkehrszählung Abrechnung) Verkehrszählung (nur für Abrechnung) Methodology duty roster duty rosterhours hours 852150 Altersteilzeit ATZ-Freist. 0,00 ATZ-Freist. vorz. ATZ-Fr. 852151 vorz. Altersteilzeit-Freistellung 852151 vorz. Altersteilzeit-Freistellung vorz. ATZ-Fr. vorz. 58er-Fr. 852152 vorz. 58er-Freistellung 852152 vorz. 58er-Freistellung vorz. 58er-Fr. 81 / 01 Stabsstellen gesamt 81 / 01 Stabsstellen gesamt 0,73 22,58 812040 Betriebsrat 812040 Betriebsrat BR 1,90 VK VK-A 1,50 1,00 010023 Absatzwirtsch., Grunds.-Planung VK-U und -handel 010024 Energiebeschaffung 010024 Energiebeschaffung und -handel VK-U 910022 Verkehrswirtsch. Grds.-Planung 910022 Verkehrswirtsch. Grds.-Planung VK-U 0,03 812010 Leitung Personal-/Sozialwesen 812010 Leitung Personal-/Sozialwesen VP 012010 Leitung Personal-/Sozialwesen 4,00 4,00 0,03 012010 Leitung Personal-/Sozialwesen VP 812020 Arbeitssicherheit 812020 Arbeitssicherheit VP-A 012020 Arbeitssicherheit 0,90 012020 Arbeitssicherheit VP-A 012025 Umweltmanagement 2,50 012025 Umweltmanagement 852020 Betriebskrankenkasse VP-A 4,75 0,00 2,40 852020 Betriebskrankenkasse 812050 Sonderaufgaben, VP-BGrundsatzfragen 0,40 814030 BetriebsleiterVT 813010 Leitung Technischer Bereich 814020 Stadtbahnangelegenheiten VT-B 814030 Betriebsleiter 0,00 2,75 1,19 0,21 0,40 VK-J 3,46 VK-K 0,35 VK-K VK-P 0,20 VK-P 0,60 VK-P 0,20 VK-R VK-R VK-R VK-U 0,30 VK-U 0,30 VK-U 0,03 1,50 0,30 0,50 0,60 0,60 0,25 0,00 1,50 0,50 3,75 1,25 0,75 0,25 0,70 0,70 4,00 0,00 4,00 0,00 0,03 in % 0,00 0,00 11,000,00 0,00 0,000,000,00 0,00 0,00% 0,00 1,500,00 0,00 0,00 0,00 0,00 0,00 0,00 0,000,00% 0,00% 0,00 0,00 0,00 1,90 21,70 0,00% 0,00 0,00% 0,00 1,000,00 8,500,00 1,60 4,75 66,40% 4,75 3,15 0,34 1,00 66,40% 1,00 0,66 0,00 0,00 1,83 0,79 0,14 0,27 2,30 0,23 0,00 0,00 0,00 0,00 0,92 2,75 0,40 1,19 0,07 0,21 0,13 0,40 1,16 0,12 1,00 0,50 0,20 0,00 0,33 0,83 0,17 0,30 0,46 0,00 0,00 0,63 0,000,00% 0,000,00% 25,20 13,98 0,00 13,98 35,68 0,00 21,70 3,15 0,66 0,17 0,00 0,17 0,42 3,46 0,35 1,50 0,50 0,60 0,00 0,50 1,25 0,25 0,08 0,70 0,24 0,00 0,00 0,00 0,00 0,95 1,00 0,66 0,32 1,00 0,34 0,25 VP-A 0,25 0,90 0,17 0,20 0,08 0,90 0,00% 0,00 0,00 0,00% 0,00% 0,00 0,00 0,00 25,20 4,75 33,60% 66,40% 1,60 1,00 33,60% 66,40% 0,34 0,00% 0,00 0,000,00% 0,00 0,00 0,00% 66,40% 0,00 3,00 0,75 66,40% 0,17 0,00% 1,50 33,60% 3,00 Gebäude Sonstiges Gebäude Sonstiges Streckeninfrastruktur Betriebslenkung 0,00% 100,00% 0,30 66,40% 0,50 0,25 0,25 0,08 3,00 ten s tellen K os tenKo stesllen B8 60 010 B 86 00 10 B8 60 020 B 86 00 20 B8 60 030 B 86 00 30 B8 60 040 B 86 00 40 B8 60 050 B 86 00 50 B8 60 201 B 86 02 01 B8 60 210 B 86 02 10 B8 60 220 B 86 02 20 B8 60 221 B 86 02 21 B8 60 222 B 86 02 22 B8 60 223 B 86 02 23 B8 60 224 B 86 02 24 B8 60 225 B 86 02 25 B8 60 230 B 86 02 30 B8 60 231 B8 60 232 B 86 02 31 B8 60 233 B 86 02 32 B8 60 234 B 86 02 33 B8 60 235 B 86 02 34 B8 60 236 B 86 02 35 B8 60 237 B 86 02 36 B8 60 240 B 86 02 37 B8 60 241 B 86 02 40 B8 60 242 B 86 02 41 B8 60 243 B 86 02 42 B8 60 244 B 86 02 43 B8 60 245 B 86 02 44 B8 60 246 B 86 02 45 B 86 02 46 working hours,... working hours,... ..... • •..... 0,00% 33,60% 33,60% 33,60% 33,60% 66,40% 0,08 0,00% 1,50 0,10 0,75 0,50 equipment, equipment,...... Hours circulation, • •Hours ofofcirculation, 33,60% 33,60% 0,20 5,26 33,60% 33,60% 0,00 3,46 3,46 3,46 33,60% 33,60% 66,40% 2,00 0,67 33,60% 66,40% 1,60 0,54 0,17 0,00 0,00 0,00 0,251,50 0,00 3,460,00 5,26 1,50 0,00 • •Vehicle types. Vehicle types.mileage, mileage, 33,60% 33,60% 66,40% 1,77 0,30 33,60% 66,40% 0,10 0,75 33,60% 66,40% 0,25 0,75 0,25 0,00 33,60% 33,60% 5,26 33,60% Be ze B ic ez hneic un hn g un g L eitun g T L e it un g T T .B ür os ( ab 02 Sc hr e ib ) T .Bü r os (a b 02 Sc hr eib ) Allg. Aus b .- we s en u.P ra k tik a nte n A llg.A u sb. -w e se n u.P r ak tika nt en Z eic h en bür o Z eich en b ür o D ez e ntr . C o ntr olling D e ze nt r. C o ntr o llin g Be tr iebs b ür o B e tr ie b sbü r o W e rk s t att In. Dien s te W er ksHtaalte tt I sn.t./B D iehf. n ste Str ab H a lte st. /Bh sf.tellen Str a b M H H alte H a lte ste lle ns tellen M H D IN H alte H a lte ste lle ns t.DSINtad tba hn H alte H a lte st. St ad tb ah nBu s H alte s tellen H a lte ste lle ns t.St Bu sad tba hn §8 H alte H a lte st. State d lle tbange h n bä § 8ude L eits L e it steLlle n ge bänge u debä ude §8 eits te lle tbabä hng eb§8 .inc l.T u L e it steSt llead n ge u de Sthad eb .inc S ta dt ba ngtba ebhng .in cl.T u l.T u Schhng alth er Sta S ta dt ba ebäu .inscl.T u dtb . Scähuse althr äu s ertbSta S ch alth S tad . dtb a U nt er we rktad s getbb.St S ch alth ä use rS a adt b U er ntks er we ge db.St U n te r w ge rk b. sSta tb adt b Were ks rk sge t attg eb äu U n te r w b. Sta d tbde G r u ahttg r leeb it g.Sign alge W er ksFta ä ud e Gr u b er bD VG F ah r leSc itgh.-alth Sigäu naslge Scähuse althr äu s er S ch alth DV G MH Scähuse althr äu S ch alth M sHer D in s l. U nt er we rk s ge b. D VG S ch alth ä use r D ins l. U nt er we rk s ge bäu de MH U n te r w er ks ge b. D VG U n te r w er ks ge bä ud e M H Kö pfKeöpf e Mita r beite rz a hl G ems am s te n Ge sa tko tk stoen da v on D VV da v on SW D U da v on DV G M itar b eit er za hl [PJ te ns te lle d av on D V V da vo n SW D U d avo n D VG [P J] ] d er dKerosKo te snst elle s o nnalPPer er so alk o ste s ten ko n 1 ,4 1, 4 1 ,6 1, 6 112 255.4 .4 27 27 5 0.8 12 50 .8 12 3,6 5 3 ,6 5 2 2 3,5 3 3 ,5 3 17 ,6 1 7, 6 15 7.9 80 1 57 .9 80 7 2.7 63 72 .7 63 16 9.7 88 1 69 .7 88 72 6.0 85 7 26 .0 85 FFM M FFL L 88.22 .2266 6 .12 8 6 .12 8 37 0 37 0 40 0 40 0 17 0 17 0 1 .06 6 1 .06 6 15 .07 8 1 5.48 .0748 1 06 1016.86 .4884 .8648 21.27 .2754 2 272.77 2277.79 .7765 .7976 47.23 .2357 34.87 3 .87 1 05 14 .74170 3 31 1 4.03 .7477 33 1 .03 7 10 3 K AP KA P 9.7 9. 05 70 5 18 18 4. 81 95 2 4 25.1 5. 01 18 1 2 45.4 5. 31 40 1 8 23.1 9 81.9 3. 73 13 1 9 1. 97 3 1. 02 5 44 9 .26 9 .2666 51 1 5 11 1 5.2 1 573 .2 73 1.0 32 1 .0 32 3.5 96 3 .5 96 4.3 79 4 .3 79 2.4 42 2 .4 42 1.5 54 1 .5 54 7.3 08 .3 08 2726 2 26 1 2.8 41 1 232 .8 41 6.3 6 .3 32 1 .10 6 1 .1 06 2 5.7 02 2 5 .7 02 31 .60 2 31 .6 02 2.8 21 2. 82 1 15 5.9 58 11 53.9 5. 99 95 8 11.0 3. 25 99 9 1 .41 3 44 S ons ig es So tnst ige s 40 5 4 05 66 66 36 0 3 60 9 .49 7 9 .4097 7 .58 7 .5 80 23 .92 4 .9724 323 .44 3 .4 47 3 05 30 5 2 7.6 83 7. 91 68 3 1 29.1 9. 78 19 1 1 13.0 1 3. 07 8 70 5.7 39 72 06.1 5. 85 73 9 6. 52 18 5 2 24.9 10 3 2 89 .65 2 739.78 28 .6572 713.41 .7837 7 00 70 0 2 39 5.8 41 2 39 5 .8 41 G es G am es at -m t - E ntlas t ung En tlas tun g ko st k oesnteI n I 1 671.89 6 96 6 7.8 58 .50 1 5 8.5 0 1 3 .96 6 3.9 6 6 1 63 .16 4 1 6 3.1 6 4 75 .44 0 7 5.4 4 0 1 73 .07 3 1 7 3.0 7 3 7 85 .65 1 8 5.6 1 337.48 2 51 3 3.4 141.94 6 82 1 4.9 2 .27 4 46 2.2 9 70 .27 9 74 7 0.2 439.76 0 79 4 3.7 29 .18 9 60 2 9.1 75 .86 4 89 7 5.8 25 .41 1 64 2 5.4 98 .11 7 11 4 60 .45 3 17 9 8.1 4 6 0.4 5 3 59 2 .98 3 3 05 .4 91 15 1 59 9.8 94 6902 .8 94 2.5 56 6 02 2.9 8 3 7 60 .99 5 887.38 8 95 6 0.9 5 .14 5 88 8 8.3 1 51 2 .5 56 5.1 4 5 8 .02 9 34 6 8 .0 29 3 46 3 78 3 09 3 78 3 09 9 .15 1 65 5 9.1 5 1 655 3 05 .49 1 5,26 33,60% 100,00% Cost Cost analysis analysis along along the the value value chain • •Channels Channelsofofdistribution distribution 33,60% 66,40% 0,90 1,33 66,40% 2,00 1,06 0,30 0,00 0,00 0,00% 1,60 66,40% 3,50 3,00 0,00 0,00 0,00% 33,60% 66,40% 0,25 0,08 33,60% 66,40% 0,90 0,30 0,25 0,00 0,00 0,00% 66,40% 1,00 0,17 66,40% 0,25 0,60 VT-B 0,00 33,60% 66,40% 0,20 VT 0,30 0,00 0,00% 0,00% VT-S 0,00 0,00 0,00 0,000,00 0,00 0,000,00 0,00 0,00 0,00 33,60% 0,54 5,26 VT-S 0,00 0,00 33,60% 1,77 0,30 0,30 2,00 0,67 1,60 0,00 0,00 33,60% 1,06 1,33 0,00 0,00 33,60% 0,30 3,50 0,60 0,50 0,00 0,00 33,60% 1,60 0,90 2,50 0,00 33,60% 0,40 5,26 2,00 2,40 0,00 33,60% VP-B 0,20 VP-A 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 33,60% 33,60% VP-S 0,50 VP-A 0,00 0,00 0,00% 0,00 0,00 0,00 33,60% 0,00% 0,00 0,000,00% 0,00 0,00 0,00% 2,75 0,92 33,60% 66,40% 1,19 0,40 33,60% 66,40% 0,21 0,07 33,60% 66,40% 66,40% 0,40 0,13 33,60% 66,40% 1,16 33,60% 66,40% 0,35 0,12 33,60% 66,40% 1,50 0,50 33,60% 66,40% 0,50 0,17 33,60% 66,40% 0,60 0,20 33,60% 0,00% 0,00 0,00 0,00% 66,40% 0,50 0,17 33,60% 66,40% 1,25 0,42 33,60% 66,40% 0,25 0,08 33,60% 66,40% 0,70 0,24 33,60% 0,00% 0,00 0,00 0,00% 0,00% 0,00 0,00 0,00% 66,40% 0,95 0,32 33,60% 66,40% 1,00 0,34 1,00 66,40% 1,50 0,33 66,40% 0,50 0,40 66,40% 0,60 0,00 0,00 0,00 0,00% 0,00% 0,00 0,33 66,40% 0,50 0,83 66,40% 1,25 0,17 66,40% 0,25 0,46 66,40% 0,70 0,00 0,00% 0,00 0,00 0,00% 0,00 0,63 66,40% 0,95 0,66 0,00 0,00% 0,00 1,83 66,40% 2,75 0,79 66,40% 1,19 0,14 66,40% 0,21 0,27 66,40% 0,40 2,30 66,40% 0,23 66,40% 0,35 Verkehrs-/Betriebsmanagement 0,00 0,00 in % Fahrfertigmachen Betriebslenkung Schiene 0,00 0,00 0,00 0,00 0,00 0,00% 0,00% 0,00 0,00% 0,00% 0,00 0,00% 0,00% 0,00 0,33 0,60 0,40 Verkehrs-/Betriebsmanagement Fahrzeuge Fahrzeuge Kundenmanagement ? davon DVG Bus in % 33,60% Betrieblicher Overhead Streckeninfrastruktur Schiene Schiene Betriebshof- management Fahrdienst Fahrdienst ? ? davon DVG davon DVG Bus Bus in % 66,40% VP VP 0,95 DVG 0,00 0,00 0,00 0,00 0,00 0,00 0,00% 0,00 0,00 0,00% 0,00 0,00 0,00% 0,00 0,00 0,00 35,68 22,58 0,50 1,00 VK-J VK-U 33,60% 0,00 8,50 0,00 0,73 VK-J VK-J VK-J Schiene 0,00 6,30 0,00 1,42 0,00 0,25 0,00 4,63 XE 811020 Recht/Liegensch./Beteiligungen/Vers. 811020 Recht/Liegensch./Beteiligungen/Vers. VK-J 011020 Recht/Liegensch./Beteiligungen/Vers. 011020 Recht/Liegensch./Beteiligungen/Vers. VK-J 911020 Recht/Liegensch./Beteiligungen/Vers. 911020 Recht/Liegensch./Beteiligungen/Vers. VK-J 852201 Wohnungsverwaltung 852201 Wohnungsverwaltung VK-J 852400 Hausmeisterei VK-J 810010 Konzerngeschäftsstelle 810010 Konzerngeschäftsstelle VK-K 010010 Konzerngeschäftsstelle 010010 Konzerngeschäftsstelle VK-K 810050 Public Relations 810050 Public Relations VK-P 0,20 0,30 010050 Public Relations 010050 Public Relations VK-P 0,20 0,60 910050 Public Relations 910050 Public Relations VK-P 0,25 810030 Revision 810030 Revision VK-R 1,50 010030 Revision 010030 Revision VK-R 3,75 910030 Revision 910030 Revision VK-R 0,75 010020 Leitung Untern.pl., Energiehandel, Verk.w. Verk.w. 010020 Leitung Untern.pl., Energiehandel, VK-U 0,30 0,70 010023 Absatzwirtsch., Grunds.-Planung 852400 Hausmeisterei 813010 Leitung Technischer 812050 Sonderaufgaben, Grundsatzfragen VP-S Bereich 0,00 0,00 BR Leitung Kaufmännische Verwaltung0,50 811010 Leitung Kaufmännische811010 Verwaltung VK 010060 Alleinabnehmer / Sonderaufgaben 010060 Alleinabnehmer / Sonderaufgaben VK-A 010040 Sonderaufgaben XE 010040 Sonderaufgaben 814020 Stadtbahnangelegenheiten 11,00 0,00 1,42 DHG 0,25 SRD 4,63 VK-B 0,00 Bus 66,40% Werkstattlager Betrieblicher Overhead 852150 Altersteilzeit 0,00 0,00 Sonstiges Betriebshofmanagement 800390 sonstige Nebengeschäfte DHGsonstige Nebengeschäfte DHG 800390 DHG 800391 sonstige Nebengeschäfte SRDsonstige Nebengeschäfte SRD 800391 SRD 000391 sonstige Nebengeschäfte SRDsonstige Nebengeschäfte VK-B 000391 SRD 85215 Freistellungen gesamt 0,00 85215 Freistellungen gesamt 0,00 0,00 Kundenmanagement 3 b) 3 b) 3 a) ? davon für DVG Sonst. DVG tats. tätig davon DVV SWDU Dritte Sonst. 6,30 Operative Instandhaltung Fahrfertigmachen 0,00 zentrale Verwaltungsfunktion DVV SWDU Dritte Marketing & Vertrieb 3 a) 3. Organisationseinheiten DVV/SWDU/DVG Kürzel davon Stellen / Organisationseinheiten DVV/SWDU/DVG tats. Kürzel tätig für 80 / 00 Sonst. Nebengeschäfte 0,00 80 / 00 Sonst. Nebengeschäfte Fahrausweisprüfung zentrale Verwaltungsfunktion 3. Stellen / Fahrausweisprüfung Werkstattlager • Moreover, there are often infrastructural disadvantages which through process efficiencies additionally seem to be twice as hard • The qualification of the staff is normally very specified – generalist acting is hardly available Management services Fahrdienst Klassischer Overhead Zentrale Verwaltungsfunktion Klassischer Overhead Werkstattoverhead Sonstiges Infrastructure Inhalt der Funktion Fahrdienst Funktion Zentrale Verwaltungsfunktion • Processes have many interfaces and reasonable cooperation with other business units are hardly used Vehicles Traction energy capital cost Maintenance cleaning vehicle-handling Funktion Leitfaden Leitfaden Werkstatt- overhead Marketing & Vertrieb Information and Security services Ticket Controlling Operative Instandhaltung Marketing & Sales Plausibility Plausibility 3 3 2 Interview-based Interview-based record of service record of service data data 0,25 1,50 0,25 1,50 Traffic management 4 4 Clearing of Adjustment of the the raw raw data datawith withthe thepeople peopleresponsible responsible Building facilities Methodology incomparable Data [m currency] comparable Data The exchange rate is Ø 1,55 CHF and Ø 250 forint per euro Price level range of service a periodic effects capitalcosts structure Cost driver 1 2 x% ... 2,5 160 132 140 120 Basic Data harmonised costs and spectrum adjusted costs Basic cost drivers Step 1 80 harmonising Step 2 adjusted Data adjusted and harmonised Data 60 40 1,8 2,0 111 Trolleybus Benchmarking 108 100 clearing Purchasing power parity Vehicles and Infrastructure 1,5 62 1,0 1,0 0,8 1,0 Report of results 0,5 20 0 0,0 14 December, 2006 Trolleybusbenchmarking_Final_v4.ppt © S2R Consulting 2006 Seite 5 Looking at the 30%-delta, costs for vehicles seem to have big room for improvement Harmonised comparison* Vehicles costs [€] car-km Example for results 0,84 0,98 0,95 0,71 1,09 Ramping up and down service ∆ 30 % 0,12 0,19 maintenance 0,16 0,18 0,34 0,32 0,55 0,31 0,19 0,62 0,14 0,47 0,081 0,64 0,26 Trolleybus Benchmarking infrastructure A Infrastructure costs [€] Car-km 1 B C D Vehicles and Infrastructure Report of results E * after method to ensure comparability between the operators, mainly due to their different circumstances value is not comparable. Transformer substations of company D are in the possession of the city 14 December, 2006 Trolleybusbenchmarking_Final_v4.ppt © S2R Consulting 2006 Seite 6 There are major differences in the costs and productivity, but the goal is clearly defined Costs per overhead wire-km Hours per overhead wire-km 5521 146 [h] [1.000 €] 76 8,9 Ø 4,4 6,8 A A B 3,0 C D F 44 3,8 2,7 Example for results 93 E B C D E 62 20 68 39 Ratio of wall anchor fixation 20 12 10 12 Age of the overhead wire 4 80 100 100 107 Width of overhead wire 100 Detailed results 20 standby group with a control function in the maintenance of the infrastructure Number of disturbances and main reasons on the overhead wire 0,49 0,49 0,24 0,24 A A BB 600 660 660 CU CUCU 20 1010 0,290,29 C C 0,29 D DE E F 600600 600 600 600 600 CU CU CU CUCU 12 12 12 1220 Line voltage Material overhead wire Statements per overhead wire - km and per annum Age Hours per overhead wire -km high 50 1,04 1,04 0,86 0,86 M ar Thunderstorm Thunderstorm low Defect Defectcomponents components Derailingofofpoles poles Reasons Reasons Derailing gi na lc to os t le ad Ø oa ll 'C C os ha m t CU Pr o e ip ' Vehicles and Infrastructure du ct iv it y le ad alloying 4 law A B C 40 Costs per hour D ed Trolleybus Benchmarking in ad pio er n sh av oi d er sh ip G le be Report of results er sh ip high 14 December, 2006 E Trolleybusbenchmarking_Final_v4.ppt © S2R Consulting 2006 Seite 7 In terms of productivity and costs the analysis sets clear targets for improvement Hours per vehicle-unit [h] Costs per hour of maintenance 1.421 [€] 586 Factor 11 292 263 B 0,06 C 0,13 D 0,06 Example for results Factor 10 74 45 40 128 A 0,14 126 Presently, Data will be verified 13 E 0,65 A Operational labour per vehicle-unit B Legend Legend C D E Capital Costs External Services Material Costs Labour Costs Other hours (caluculated) Accidents / Vandalism Revision / extra ordinary work Spare part utilisation Blue colour equipment² Detailed results ...some companies are on the right track Structure of dysfunctions in % 10 M ar 62 high 24 12 2 C 11 75 44 D 9 16 9 26 32 E 1 7 92 'C 1 1 Vehicles / Car body Transmission engine Electro techniques Other techniques 1 Car body: No data available to os t le ad os Ch t am le p ad io er n sh ip ' low A B oa ll C in e av oi d ed Trolleybus Benchmarking Pr o 40 Cost per hour D be Ø er sh ip G low 44 21 gi na lc 200 B 3 Hours per vehicle - unit A Vehicles and Infrastructure du ct iv it y le ad Report of results er sh ip high 14 December, 2006 E Trolleybusbenchmarking_Final_v4.ppt © S2R Consulting 2006 Seite 8 The main fields of action can be derived per operator individually ... further Trolleybus-operators will take part in the benchmarking e.g. together Need for detailed analysis Company Maintenance Costs Hours Vehiclehandling infrastructure Costs Costs Hours Conclusion and summary Hours A B e.g. individual C D Trolleybus Benchmarking Vehicles and Infrastructure E Report of results 14 December, 2006 Improvement necessary Continuous improvement process Competitive Trolleybusbenchmarking_Final_v4.ppt © S2R Consulting 2006 Seite 9 In-depth analysis and concrete measures can be now systematically evaluated Phase 1 Technology Operation Administration ... Further proceeding Deep analysis phase Deep process analysis and concrete measures in the area of operational vehicle maintenance, vehicle-handling and infrastructure to improve the situation of the company Definition of a specific required process and its comparison with the actual process Period for testing – Utilisation of the required process and elimination of emerging barriers Analysis of the technical overhead and especially of the technical work preparation process Trolleybus Benchmarking Vehicles and Infrastructure Analysis of the materials management process and bounded Report of results capital invested in assets ... 14 December, 2006 Trolleybusbenchmarking_Final_v4.ppt © S2R Consulting 2006 Seite 10 The enlargement of the circle of participants will lead to an even greater base of knowledge Further proceeding Five PTOs have successfully conducted this strategic benchmarking project in the technical areas of their trolley-bus operations Other Trolleybus operators have now committed themselves to the second group of participants We are also very happy that operators from Russia (Vologdaelektrotrans) and Estonia (Tallinna Trammi- Ja Trollibussikoondise AS) are joining the project as well We would be happy if further companies are interested in the rally to become the performance champignon Trolleybus Benchmarking Vehicles and Infrastructure Report of results 14 December, 2006 Trolleybusbenchmarking_Final_v4.ppt © S2R Consulting 2006 Seite 11 If you have any questions or if you would like to receive further information, please do not hesitate to contact us [email protected] www.s2r-consulting.com S2R Consulting GmbH Dreikoenigstrasse 31a CH – 8002 Zurich fon +41 (0)44 208 32 10 fax +41 (0)44 208 35 00 S2R Consulting KG Trolleybus Benchmarking Weidestrasse 120bVehicles and Infrastructure D – 22083 Hamburg Report of results fon +49 (0)40 288 076 60 fax +49 (0)40 288 076 65 14 December, 2006 Trolleybusbenchmarking_Final_v4.ppt © S2R Consulting 2006 Seite 12