Installation Instructions - Cequent Performance Products

Transcription

Installation Instructions - Cequent Performance Products

                                    

Documents pareils

Installation Instructions - Cequent Performance Products

Installation Instructions - Cequent Performance Products Tighten all 3/8 GR2 fasteners with torque wrench to 20 Lb.-Ft. Tighten all M10 CL8.8 fasteners with torque wrench to 42 Lb.-Ft. Note: check hitch frequently, making sure all fasteners and ball are ...

Plus en détail

Installation Instructions - Draw-Tite

Installation Instructions - Draw-Tite Tighten all 7/16 GR5 fasteners with torque wrench to 50 Lb.-Ft. (68 N*M) Note: check hitch frequently, making sure all fasteners and ball are properly tightened. If hitch is removed, plug all holes...

Plus en détail